Optimization Calculation of Construction Control of a Through Bowstring Arch Bridge
Zhaohua Wang
Abstract
Zhaohua Wang
Abstract
The superstructure of the main bridge of a bridge is a through bowstring arch bridge of concrete-filled steel tubes with calculated span length 84 m. This paper presents the optimization calculation of monitoring and control at both the early stage and in course of the construction of the bridge. The results of the calculation have already served as the guidance to the construction of the bridge.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The superstructure of the main bridge of a bridge is a through bowstring arch bridge of concrete-filled steel tubes with calculated span length 84 m. This paper presents the optimization calculation of monitoring and control at both the early stage and in course of the construction of the bridge. The results of the calculation have already served as the guidance to the construction of the bridge.
Key concepts: Bridge (graph theory), Arch, Structural engineering, Arch bridge, Engineering, Beam bridge, Span (engineering), Superstructure