Coiled-Tubing-Conveyed Fracturing: an Alternative to Workover Rigs
Karen Bybee
Abstract
Karen Bybee
Abstract
This article, written by Assistant Technology Editor Karen Bybee, contains highlights of paper SPE 89446, "Coiled- Tubing-Conveyed Fracturing Technique Provides Economic Alternative to Workover Rigs in Stimulation Campaign," by Achour Allouti, Bachir Ben Amor, and Ali Ferhat, Sonatrach, and Mark Oettli, Avel Ortiz, and Jodi Wood, Schlumberger, prepared for the 2004 SPE/ICoTA Coiled Tubing Conference and Exhibition, Houston, 23-24 March.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This article, written by Assistant Technology Editor Karen Bybee, contains highlights of paper SPE 89446, "Coiled- Tubing-Conveyed Fracturing Technique Provides Economic Alternative to Workover Rigs in Stimulation Campaign," by Achour Allouti, Bachir Ben Amor, and Ali Ferhat, Sonatrach, and Mark Oettli, Avel Ortiz, and Jodi Wood, Schlumberger, prepared for the 2004 SPE/ICoTA Coiled Tubing Conference and Exhibition, Houston, 23-24 March.
Key concepts: Workover, Coiled tubing, Petroleum engineering, Geology, Engineering