True Hybrid Operations Combining Coiled Tubing Drilling and Conventional Rig Workover Techniques and Practices

Udo Cassee, Devin Rock, Dan Kara, Sean McLaughlin

Open publisher page 1 citations

Abstract

Abstract This paper documents the results of a new stage of development in the application of coiled tubing drilling. Combining coiled tubing drilling technology with a conventional jointed pipe workover capability represents the next step change in providing low-cost reserves access solutions through selection of the most efficient tool for the application. Drilling sidetracks using coiled tubing is an established practice in Alaska's North Slope oil fields. During these operations the use of jointed pipe, except for running liners, with the coiled tubing drilling rig was avoided. A conventional workover rig was the preferred approach to prepare the coiled-tubing-candidate well when it required a change out of production tubing or other workover activity. In 2001 a North Slope operator evaluated the opportunity to utilize one rig to perform both operations. In 2002 a workover rig was modified to fit the need. Although it appears very obvious and straightforward to combine two established technologies, there are many challenges to overcome. Specialized equipment, multidisciplinary personnel, and control of overall well cost are just a few of the many parts of the operation that had to be planned. This paper details the results, problems encountered, solutions, and a quantification of the real benefits achieved combining coiled tubing drilling with a jointed pipe workover.

About this research paper

What this paper is about

Abstract This paper documents the results of a new stage of development in the application of coiled tubing drilling. Combining coiled tubing drilling technology with a conventional jointed pipe workover capability represents the next step change in providing low-cost reserves access solutions through selection of the most efficient tool for the application. Drilling sidetracks using coiled tubing is an established practice in Alaska's North Slope oil fields. During these operations the use of jointed pipe, except for running liners, with the coiled tubing drilling rig was avoided. A conventional workover rig was the preferred approach to prepare the coiled-tubing-candidate well when it required a change out of production tubing or other workover activity. In 2001 a North Slope operator evaluated the opportunity to utilize one rig to perform both operations. In 2002 a workover rig was modified to fit the need. Although it appears very obvious and straightforward to combine two established technologies, there are many challenges to overcome. Specialized equipment, multidisciplinary personnel, and control of overall well cost are just a few of the many parts of the operation that had to be planned. This paper details the results, problems encountered, solutions, and a quantification of the real benefits achieved combining coiled tubing drilling with a jointed pipe workover.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract This paper documents the results of a new stage of development in the application of coiled tubing drilling. Combining coiled tubing drilling technology with a conventional jointed pipe workover capability represents the next step change in providing low-cost reserves access solutions through selection of the most efficient tool for the application. Drilling sidetracks using coiled tubing is an established practice in Alaska's North Slope oil fields. During these operations the use of jointed pipe, except for running liners, with the coiled tubing drilling rig was avoided. A conventional workover rig was the preferred approach to prepare the coiled-tubing-candidate well when it required a change out of production tubing or other workover activity. In 2001 a North Slope operator evaluated the opportunity to utilize one rig to perform both operations. In 2002 a workover rig was modified to fit the need. Although it appears very obvious and straightforward to combine two established technologies, there are many challenges to overcome. Specialized equipment, multidisciplinary personnel, and control of overall well cost are just a few of the many parts of the operation that had to be planned. This paper details the results, problems encountered, solutions, and a quantification of the real benefits achieved combining coiled tubing drilling with a jointed pipe workover.

Key concepts: Workover, Coiled tubing, Petroleum engineering, Drilling, Engineering, Marine engineering, Directional drilling, Completion (oil and gas wells)