Coiled Tubing as an Alternative to Service-Rig Completions for Multifractured Horizontal Wells in the Westerorse Gas Fields in Alberta
Ramzi Abdulkadir, S. Kreuger, D. Aunger, J. McMullen
Abstract
Ramzi Abdulkadir, S. Kreuger, D. Aunger, J. McMullen
Abstract
Abstract This paper presents a case study of horizontal-well completions in the Westerose field in Central Alberta in which coiled tubing was used in multiple hydraulic-fracture stimulations. Coiled tubing is cost effective, and offers many operational advantages over the conventional workover rig. The design of the well-completion program, including risk analysis and contingency plans, is discussed. A bottomhole assembly (BHA) that allows running and setting a bridge plug to isolate a lower section of the well and perforating the next section in one trip is discussed. PanCanadian's experience with coiled tubing and conventional workover rigs is also presented. P. 149
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Abstract This paper presents a case study of horizontal-well completions in the Westerose field in Central Alberta in which coiled tubing was used in multiple hydraulic-fracture stimulations. Coiled tubing is cost effective, and offers many operational advantages over the conventional workover rig. The design of the well-completion program, including risk analysis and contingency plans, is discussed. A bottomhole assembly (BHA) that allows running and setting a bridge plug to isolate a lower section of the well and perforating the next section in one trip is discussed. PanCanadian's experience with coiled tubing and conventional workover rigs is also presented. P. 149
Key concepts: Workover, Coiled tubing, Petroleum engineering, Engineering, Completion (oil and gas wells), Well stimulation, Section (typography), Directional drilling