1998SPE/ICoTA Coiled Tubing RoundtableRequires access

Coiled Tubing as an Alternative to Service-Rig Completions for Multifractured Horizontal Wells in the Westerorse Gas Fields in Alberta

Ramzi Abdulkadir, S. Kreuger, D. Aunger, J. McMullen

Open publisher page 1 citations

Abstract

Abstract This paper presents a case study of horizontal-well completions in the Westerose field in Central Alberta in which coiled tubing was used in multiple hydraulic-fracture stimulations. Coiled tubing is cost effective, and offers many operational advantages over the conventional workover rig. The design of the well-completion program, including risk analysis and contingency plans, is discussed. A bottomhole assembly (BHA) that allows running and setting a bridge plug to isolate a lower section of the well and perforating the next section in one trip is discussed. PanCanadian's experience with coiled tubing and conventional workover rigs is also presented. P. 149

About this research paper

What this paper is about

Abstract This paper presents a case study of horizontal-well completions in the Westerose field in Central Alberta in which coiled tubing was used in multiple hydraulic-fracture stimulations. Coiled tubing is cost effective, and offers many operational advantages over the conventional workover rig. The design of the well-completion program, including risk analysis and contingency plans, is discussed. A bottomhole assembly (BHA) that allows running and setting a bridge plug to isolate a lower section of the well and perforating the next section in one trip is discussed. PanCanadian's experience with coiled tubing and conventional workover rigs is also presented. P. 149

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract This paper presents a case study of horizontal-well completions in the Westerose field in Central Alberta in which coiled tubing was used in multiple hydraulic-fracture stimulations. Coiled tubing is cost effective, and offers many operational advantages over the conventional workover rig. The design of the well-completion program, including risk analysis and contingency plans, is discussed. A bottomhole assembly (BHA) that allows running and setting a bridge plug to isolate a lower section of the well and perforating the next section in one trip is discussed. PanCanadian's experience with coiled tubing and conventional workover rigs is also presented. P. 149

Key concepts: Workover, Coiled tubing, Petroleum engineering, Engineering, Completion (oil and gas wells), Well stimulation, Section (typography), Directional drilling

Related papers

Back to paper searchBrowse research topicsOriginal source
Coiled Tubing as an Alternative to Service-Rig Completions for Multifractured Horizontal Wells in the Westerorse Gas Fields in Alberta — Research Paper | ScholarLens