Construction of diversion tunnel for Sewa H.E. Project - A case study
R.K. Khali
Abstract
R.K. Khali
Abstract
Sewa Hydroelectric Project (120 MW) is located in Kathua district of Jammu and Kashmir. J&K region is situated in foot-hills of Himalayas. This paper is a case study and deals with planning process and various construction features of a 298 m long 6m horse shoe shaped concrete lined tunnel. This tunnel though not very long in length had typical design having two horizontal bends. Tunnel was passing through granite stone and having seepage at various locations. The tunnel was bored by conventional drilling and blasting method by using full face method.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Sewa Hydroelectric Project (120 MW) is located in Kathua district of Jammu and Kashmir. J&K region is situated in foot-hills of Himalayas. This paper is a case study and deals with planning process and various construction features of a 298 m long 6m horse shoe shaped concrete lined tunnel. This tunnel though not very long in length had typical design having two horizontal bends. Tunnel was passing through granite stone and having seepage at various locations. The tunnel was bored by conventional drilling and blasting method by using full face method.
Key concepts: Drilling and blasting, Rock blasting, Hydroelectricity, Mining engineering, Geology, Geotechnical engineering, Excavation, Drilling