Construction of diversion tunnel for Sewa H.E. Project - A case study

R.K. Khali

Open publisher page 0 citations

Abstract

Sewa Hydroelectric Project (120 MW) is located in Kathua district of Jammu and Kashmir. J&K region is situated in foot-hills of Himalayas. This paper is a case study and deals with planning process and various construction features of a 298 m long 6m horse shoe shaped concrete lined tunnel. This tunnel though not very long in length had typical design having two horizontal bends. Tunnel was passing through granite stone and having seepage at various locations. The tunnel was bored by conventional drilling and blasting method by using full face method.

About this research paper

What this paper is about

Sewa Hydroelectric Project (120 MW) is located in Kathua district of Jammu and Kashmir. J&K region is situated in foot-hills of Himalayas. This paper is a case study and deals with planning process and various construction features of a 298 m long 6m horse shoe shaped concrete lined tunnel. This tunnel though not very long in length had typical design having two horizontal bends. Tunnel was passing through granite stone and having seepage at various locations. The tunnel was bored by conventional drilling and blasting method by using full face method.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Sewa Hydroelectric Project (120 MW) is located in Kathua district of Jammu and Kashmir. J&K region is situated in foot-hills of Himalayas. This paper is a case study and deals with planning process and various construction features of a 298 m long 6m horse shoe shaped concrete lined tunnel. This tunnel though not very long in length had typical design having two horizontal bends. Tunnel was passing through granite stone and having seepage at various locations. The tunnel was bored by conventional drilling and blasting method by using full face method.

Key concepts: Drilling and blasting, Rock blasting, Hydroelectricity, Mining engineering, Geology, Geotechnical engineering, Excavation, Drilling