Parbati HEP, Stage-1 (800 MW) is located in lesser Himalayan zone. The project is situated in Kullu district of H.P. The project is located on Parbati river and comprises of 85 m high concrete dam and a concrete lined head race tunnel of 6m diameter and of length 31.6 km on the left bank of the river. This tunnel carries water to surface powerhouse located on the right bank of Sainj river. From the head race tunnel, the water is carried to powerhouse through two numbers of inclined pressure shaft, each of 1542 m having a bored diameter of 4.8m and finished diameter of 3.5m. The pressure shaft is totally lined by high grade steel to bear the high pressure. A surgeshaft of 17m diameter and 130m depth is to be constructed to take care of the surge. The surge shaft is also having two surge galleries. With two inclined pressure shafts @ 48m c/c (inclined at 30 degree to horizontal), with an excavated diameter of 4.8m will be excavated by TBM. This TBM has been specially selected to work in inclined tunnel having precautionary measures like anti-back slip device, auxiliary thrust cylinder. The excavated tunnel will be simultaneously lined with the honeycombed precast segments. This paper illustrates/elaborates the meticulous and flawless planning along with the enormous infrastructure required to be done for the successful completion of inclined tunnel of such a large length for the first time in India.

About this research paper

What this paper is about

Parbati HEP, Stage-1 (800 MW) is located in lesser Himalayan zone. The project is situated in Kullu district of H.P. The project is located on Parbati river and comprises of 85 m high concrete dam and a concrete lined head race tunnel of 6m diameter and of length 31.6 km on the left bank of the river. This tunnel carries water to surface powerhouse located on the right bank of Sainj river. From the head race tunnel, the water is carried to powerhouse through two numbers of inclined pressure shaft, each of 1542 m having a bored diameter of 4.8m and finished diameter of 3.5m. The pressure shaft is totally lined by high grade steel to bear the high pressure. A surgeshaft of 17m diameter and 130m depth is to be constructed to take care of the surge. The surge shaft is also having two surge galleries. With two inclined pressure shafts @ 48m c/c (inclined at 30 degree to horizontal), with an excavated diameter of 4.8m will be excavated by TBM. This TBM has been specially selected to work in inclined tunnel having precautionary measures like anti-back slip device, auxiliary thrust cylinder. The excavated tunnel will be simultaneously lined with the honeycombed precast segments. This paper illustrates/elaborates the meticulous and flawless planning along with the enormous infrastructure required to be done for the successful completion of inclined tunnel of such a large length for the first time in India.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Parbati HEP, Stage-1 (800 MW) is located in lesser Himalayan zone. The project is situated in Kullu district of H.P. The project is located on Parbati river and comprises of 85 m high concrete dam and a concrete lined head race tunnel of 6m diameter and of length 31.6 km on the left bank of the river. This tunnel carries water to surface powerhouse located on the right bank of Sainj river. From the head race tunnel, the water is carried to powerhouse through two numbers of inclined pressure shaft, each of 1542 m having a bored diameter of 4.8m and finished diameter of 3.5m. The pressure shaft is totally lined by high grade steel to bear the high pressure. A surgeshaft of 17m diameter and 130m depth is to be constructed to take care of the surge. The surge shaft is also having two surge galleries. With two inclined pressure shafts @ 48m c/c (inclined at 30 degree to horizontal), with an excavated diameter of 4.8m will be excavated by TBM. This TBM has been specially selected to work in inclined tunnel having precautionary measures like anti-back slip device, auxiliary thrust cylinder. The excavated tunnel will be simultaneously lined with the honeycombed precast segments. This paper illustrates/elaborates the meticulous and flawless planning along with the enormous infrastructure required to be done for the successful completion of inclined tunnel of such a large length for the first time in India.

Key concepts: Surge, Geotechnical engineering, Geology, Head (geology), Slip (aerodynamics), Water pressure, Thrust, Surge tank

Related papers

Back to paper searchBrowse research topicsOriginal source
Boring by TBM of Inclined Pressure Shaft Planning and Infrastructure — Research Paper | ScholarLens