1200 kV national test station: key issues
I.S. Jha, Surendra Kumar Agarwal, Maanvi Bhatnagar, Brinda Bhowmick, Sachin B. Rao, Kashif Usman
Abstract
I.S. Jha, Surendra Kumar Agarwal, Maanvi Bhatnagar, Brinda Bhowmick, Sachin B. Rao, Kashif Usman
Abstract
Indian power system is expanding at high rate with present installed capacity is about 1,64,000 MW comprising about 64% thermal, 23% hydro, 10% renewable and balance nuclear sources. The Planning Commission projections indicated about three (3) fold increase in peak demand over the next decade (by 2021/22) to a level of about 323,000 MW from the present level of about 119,000 MW for which total installed capacity of about 480 GW is envisaged. However optimal utilization of unevenly distributed energy resources in the country along with severe right of way issue and phase-wise development of transmission infrastructure necessitates establishment of high power transmission corridors. Towards this, a number of transmission corridors comprising 765kV AC, 1200kV AC, ± 800kV, 6000MW HVDC system have been planned/under implementation.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Indian power system is expanding at high rate with present installed capacity is about 1,64,000 MW comprising about 64% thermal, 23% hydro, 10% renewable and balance nuclear sources. The Planning Commission projections indicated about three (3) fold increase in peak demand over the next decade (by 2021/22) to a level of about 323,000 MW from the present level of about 119,000 MW for which total installed capacity of about 480 GW is envisaged. However optimal utilization of unevenly distributed energy resources in the country along with severe right of way issue and phase-wise development of transmission infrastructure necessitates establishment of high power transmission corridors. Towards this, a number of transmission corridors comprising 765kV AC, 1200kV AC, ± 800kV, 6000MW HVDC system have been planned/under implementation.
Key concepts: Renewable energy, Transmission (telecommunications), Nameplate capacity, Power transmission, Commission, Nuclear power, Engineering, Electrical engineering