2009Water and Energy InternationalRequires access

1200 kV transmission system and status of development of substation equipment/transmission line material in India

R.N. Nayak, Maanvi Bhatnagar, Brinda Bhowmick, R.K. Tyagi

Open publisher page 14 citations

Abstract

The Indian Power Sector is growing at an accelerated pace. Peak demand is expected to be more than 157,000 MW by 2012 which necessitates installed capacity of about 210,000 MW. Further, to meet the growth rate of Indian economy, installed capacity of power generation shall be about 600,000 MW by 2025. To keep pace with generation, transmission system needs to be strengthened for power transfer from generating stations to the load centres. Considering the serious difficulty of availability of Right of Way (ROW), it is considered prudent to adopt 1200 kV AC as next transmission voltage level in the country for transfer of bulk power. To develop 1200 kV AC technology indigenously, a 1200kV test station is being established at Bina, Madhya Pradesh in central part of India in association with 25 Indian manufacturers. In this project, POWERGRID shall provide the platform such as AC network connection, transmission lines, testing facilities and other infrastructures at Bina substations and Equipment Manufactures shall install their 1200 kV Equipments for field testing and trial. Based on the field testing and experience gained on the performance of 1200 kV equipments, technical parameters shall be fine tuned for 1200 kV AC transmission system. The test station shall consist of 2 nos. bays of 1200 kV, 2 sets of 1200 kV transformers (1000 MVA each Bank) and one single circuit & one double circuit 1200 kV Transmission Lines (about 1 km each).

About this research paper

What this paper is about

The Indian Power Sector is growing at an accelerated pace. Peak demand is expected to be more than 157,000 MW by 2012 which necessitates installed capacity of about 210,000 MW. Further, to meet the growth rate of Indian economy, installed capacity of power generation shall be about 600,000 MW by 2025. To keep pace with generation, transmission system needs to be strengthened for power transfer from generating stations to the load centres. Considering the serious difficulty of availability of Right of Way (ROW), it is considered prudent to adopt 1200 kV AC as next transmission voltage level in the country for transfer of bulk power. To develop 1200 kV AC technology indigenously, a 1200kV test station is being established at Bina, Madhya Pradesh in central part of India in association with 25 Indian manufacturers. In this project, POWERGRID shall provide the platform such as AC network connection, transmission lines, testing facilities and other infrastructures at Bina substations and Equipment Manufactures shall install their 1200 kV Equipments for field testing and trial. Based on the field testing and experience gained on the performance of 1200 kV equipments, technical parameters shall be fine tuned for 1200 kV AC transmission system. The test station shall consist of 2 nos. bays of 1200 kV, 2 sets of 1200 kV transformers (1000 MVA each Bank) and one single circuit & one double circuit 1200 kV Transmission Lines (about 1 km each).

Why it matters

OpenAlex reports 14 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Indian Power Sector is growing at an accelerated pace. Peak demand is expected to be more than 157,000 MW by 2012 which necessitates installed capacity of about 210,000 MW. Further, to meet the growth rate of Indian economy, installed capacity of power generation shall be about 600,000 MW by 2025. To keep pace with generation, transmission system needs to be strengthened for power transfer from generating stations to the load centres. Considering the serious difficulty of availability of Right of Way (ROW), it is considered prudent to adopt 1200 kV AC as next transmission voltage level in the country for transfer of bulk power. To develop 1200 kV AC technology indigenously, a 1200kV test station is being established at Bina, Madhya Pradesh in central part of India in association with 25 Indian manufacturers. In this project, POWERGRID shall provide the platform such as AC network connection, transmission lines, testing facilities and other infrastructures at Bina substations and Equipment Manufactures shall install their 1200 kV Equipments for field testing and trial. Based on the field testing and experience gained on the performance of 1200 kV equipments, technical parameters shall be fine tuned for 1200 kV AC transmission system. The test station shall consist of 2 nos. bays of 1200 kV, 2 sets of 1200 kV transformers (1000 MVA each Bank) and one single circuit & one double circuit 1200 kV Transmission Lines (about 1 km each).

Key concepts: Electrical engineering, Electric power transmission, Transformer, Engineering, Pace, Transmission line, Power transmission, Transfer (computing)

Related papers

Back to paper searchBrowse research topicsOriginal source
1200 kV transmission system and status of development of substation equipment/transmission line material in India — Research Paper | ScholarLens