2009Water and Energy InternationalRequires access

Development of 1200 KV Transmission System in India

V. Ramakrishna, Subir Sen

Open publisher page 2 citations

Abstract

The Indian power system is developing at an accelerated pace and it is anticipated that peak demand shall increase to over 400 GW by 2022 and beyond for which total installed generation capacity of about 500 GW is envisaged. To optimally utilize the unevenly distributed energy resources and taking into account severe right of way issues, transfer of bulk power over long distance is required. Towards this, National Grid interconnecting all the five(5) regional electrical grids comprising high capacity 400 kV/765 kV AC and ±500 kV HVDC system has been established. Today, National Grid with inter-regional capacity of about 17,000 MW is in place. Further, central grid comprising of the Northern, Western, Eastern and North-eastern Regions is operating as a single synchronous grid of 105 GW capacity and asynchronously connected to the Southern region of about 40 GW. To meet the growing power demand of various regions power transfer capacity of the inter-regional links are being enhanced continuously.

About this research paper

What this paper is about

The Indian power system is developing at an accelerated pace and it is anticipated that peak demand shall increase to over 400 GW by 2022 and beyond for which total installed generation capacity of about 500 GW is envisaged. To optimally utilize the unevenly distributed energy resources and taking into account severe right of way issues, transfer of bulk power over long distance is required. Towards this, National Grid interconnecting all the five(5) regional electrical grids comprising high capacity 400 kV/765 kV AC and ±500 kV HVDC system has been established. Today, National Grid with inter-regional capacity of about 17,000 MW is in place. Further, central grid comprising of the Northern, Western, Eastern and North-eastern Regions is operating as a single synchronous grid of 105 GW capacity and asynchronously connected to the Southern region of about 40 GW. To meet the growing power demand of various regions power transfer capacity of the inter-regional links are being enhanced continuously.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Indian power system is developing at an accelerated pace and it is anticipated that peak demand shall increase to over 400 GW by 2022 and beyond for which total installed generation capacity of about 500 GW is envisaged. To optimally utilize the unevenly distributed energy resources and taking into account severe right of way issues, transfer of bulk power over long distance is required. Towards this, National Grid interconnecting all the five(5) regional electrical grids comprising high capacity 400 kV/765 kV AC and ±500 kV HVDC system has been established. Today, National Grid with inter-regional capacity of about 17,000 MW is in place. Further, central grid comprising of the Northern, Western, Eastern and North-eastern Regions is operating as a single synchronous grid of 105 GW capacity and asynchronously connected to the Southern region of about 40 GW. To meet the growing power demand of various regions power transfer capacity of the inter-regional links are being enhanced continuously.

Key concepts: Grid, Pace, Electric power system, Nameplate capacity, Electric power transmission, Transfer (computing), Regional power, Transmission (telecommunications)

Related papers

Back to paper searchBrowse research topicsOriginal source
Development of 1200 KV Transmission System in India — Research Paper | ScholarLens