ApplicAtion of new technology SolutionS for MiniMizing Land use for overhead transmission lines – Indian Experience

Chandrakant, Anish Anand, Gopalji, Gopal K. Gupta, Bhavna Pandey, D.K. Valecha, Ishan Jha

Open publisher page 1 citations

Abstract

Indian Power System has grown rapidly in the past two decades. The transmission lines traverse length & breadth of the country. Due to high population density, growth of habitation & infrastructure, the right of way constraints and environmental concerns have increased substantially over the years with the growth of the transmission network. Power Grid Corporation of India Ltd. (POWERGRID) as part of its efforts for sustainable development of transmission network in the country, has taken various initiatives involving new technologies/new innovative solutions aiming to minimize the environmental impact and land use of transmission lines. One of the major features of the development of transmission network has been adoption of high voltage bulk power transmission lines. With introduction of 765 kV Double Circuit transmission lines, +/- 800 kV UHVDC and 1200 kV UHVAC transmission lines in the country, which are presently under construction, there is quantum reduction in the right-of-way (ROW) requirement per MW of power transferred. As yet another initiative to minimize the land use and environmental impact of transmission lines, use of multi-circuit towers has been brought into practice. Further, since construction of multi-circuit towers with quadruple bundle conductors involve substantial resources, efforts & cost, new technology High Temperature Low Sag (HTLS) conductors are being used for reduction in bundle conductors (from quadruple/triple bundle to twin bundle). The paper highlights various examples of initiatives taken by POWERGRID in application of new technology solutions to minimize the land use and impact of transmission lines. Actual cases of adoption of 765 kV double circuit lines, +/-800 kV UHVDC lines, 1200 kV UHVAC lines, 400 kV multi-circuit lines with HTLS conductors, 400 kV double circuit tubular/pole structures with HTLS conductors etc. have been described. Salient features and results of techno-economic studies & developmental activities undertaken for realization of such initiatives have also been presented in the paper.

About this research paper

What this paper is about

Indian Power System has grown rapidly in the past two decades. The transmission lines traverse length & breadth of the country. Due to high population density, growth of habitation & infrastructure, the right of way constraints and environmental concerns have increased substantially over the years with the growth of the transmission network. Power Grid Corporation of India Ltd. (POWERGRID) as part of its efforts for sustainable development of transmission network in the country, has taken various initiatives involving new technologies/new innovative solutions aiming to minimize the environmental impact and land use of transmission lines. One of the major features of the development of transmission network has been adoption of high voltage bulk power transmission lines. With introduction of 765 kV Double Circuit transmission lines, +/- 800 kV UHVDC and 1200 kV UHVAC transmission lines in the country, which are presently under construction, there is quantum reduction in the right-of-way (ROW) requirement per MW of power transferred. As yet another initiative to minimize the land use and environmental impact of transmission lines, use of multi-circuit towers has been brought into practice. Further, since construction of multi-circuit towers with quadruple bundle conductors involve substantial resources, efforts & cost, new technology High Temperature Low Sag (HTLS) conductors are being used for reduction in bundle conductors (from quadruple/triple bundle to twin bundle). The paper highlights various examples of initiatives taken by POWERGRID in application of new technology solutions to minimize the land use and impact of transmission lines. Actual cases of adoption of 765 kV double circuit lines, +/-800 kV UHVDC lines, 1200 kV UHVAC lines, 400 kV multi-circuit lines with HTLS conductors, 400 kV double circuit tubular/pole structures with HTLS conductors etc. have been described. Salient features and results of techno-economic studies & developmental activities undertaken for realization of such initiatives have also been presented in the paper.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Indian Power System has grown rapidly in the past two decades. The transmission lines traverse length & breadth of the country. Due to high population density, growth of habitation & infrastructure, the right of way constraints and environmental concerns have increased substantially over the years with the growth of the transmission network. Power Grid Corporation of India Ltd. (POWERGRID) as part of its efforts for sustainable development of transmission network in the country, has taken various initiatives involving new technologies/new innovative solutions aiming to minimize the environmental impact and land use of transmission lines. One of the major features of the development of transmission network has been adoption of high voltage bulk power transmission lines. With introduction of 765 kV Double Circuit transmission lines, +/- 800 kV UHVDC and 1200 kV UHVAC transmission lines in the country, which are presently under construction, there is quantum reduction in the right-of-way (ROW) requirement per MW of power transferred. As yet another initiative to minimize the land use and environmental impact of transmission lines, use of multi-circuit towers has been brought into practice. Further, since construction of multi-circuit towers with quadruple bundle conductors involve substantial resources, efforts & cost, new technology High Temperature Low Sag (HTLS) conductors are being used for reduction in bundle conductors (from quadruple/triple bundle to twin bundle). The paper highlights various examples of initiatives taken by POWERGRID in application of new technology solutions to minimize the land use and impact of transmission lines. Actual cases of adoption of 765 kV double circuit lines, +/-800 kV UHVDC lines, 1200 kV UHVAC lines, 400 kV multi-circuit lines with HTLS conductors, 400 kV double circuit tubular/pole structures with HTLS conductors etc. have been described. Salient features and results of techno-economic studies & developmental activities undertaken for realization of such initiatives have also been presented in the paper.

Key concepts: Electric power transmission, Overhead (engineering), Electrical engineering, Transmission (telecommunications), Power transmission, Bundle, Engineering, Transmission line

Related papers

Back to paper searchBrowse research topicsOriginal source
ApplicAtion of new technology SolutionS for MiniMizing Land use for overhead transmission lines – Indian Experience — Research Paper | ScholarLens