Application of phase angle measurement for real time security monitoring of Indian Electric Power System- An Experience
S.K. Soonee, S.R. Narasimhan, R.K. Porwal, Sanjeev Kumar, Raj Kumar, Vivek Pandey
Abstract
S.K. Soonee, S.R. Narasimhan, R.K. Porwal, Sanjeev Kumar, Raj Kumar, Vivek Pandey
Abstract
The Indian electric power system has expanded manifold and is on a high growth phase. The five synchronous separate geopolitical grids, which developed independently, have been integrated gradually. In August 2006, the 25 GW Northern grid was synchronised to the “North East-East-West” grid to form the North East—East-West grid now designated as the “N-E-W grid” having installed capacity of around 90 GW (peak 60 GW). The 25 GW South India grid (installed capacity of over 36 GW), is presently connected asynchronously to the N-E-W-grid through 4 GW of HVDC links Fig. 1.
OpenAlex reports 22 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The Indian electric power system has expanded manifold and is on a high growth phase. The five synchronous separate geopolitical grids, which developed independently, have been integrated gradually. In August 2006, the 25 GW Northern grid was synchronised to the “North East-East-West” grid to form the North East—East-West grid now designated as the “N-E-W grid” having installed capacity of around 90 GW (peak 60 GW). The 25 GW South India grid (installed capacity of over 36 GW), is presently connected asynchronously to the N-E-W-grid through 4 GW of HVDC links Fig. 1.
Key concepts: Grid, Geopolitics, Power grid, Phase (matter), Power (physics), Electrical engineering, Geography, Engineering