Saudi Arabian crude oil pipeline snaking across Desert Peninsula

O.K. Burke

Open publisher page 0 citations

Abstract

In the construction of the Petromin east-west crude oil pipeline system several pipelining operations are progressing simultaneously, including clearing the right-of-way, ditching, pipe hauling, protective coating, and joining. The two parts of the pipe route construction are 12 to 15% complete. In addition to actual pipelaying operations, contractors are building access roads to the 11 pump stations, air strips for the three maintenance centers along the route, storage facilities, and terminal projects.

About this research paper

What this paper is about

In the construction of the Petromin east-west crude oil pipeline system several pipelining operations are progressing simultaneously, including clearing the right-of-way, ditching, pipe hauling, protective coating, and joining. The two parts of the pipe route construction are 12 to 15% complete. In addition to actual pipelaying operations, contractors are building access roads to the 11 pump stations, air strips for the three maintenance centers along the route, storage facilities, and terminal projects.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In the construction of the Petromin east-west crude oil pipeline system several pipelining operations are progressing simultaneously, including clearing the right-of-way, ditching, pipe hauling, protective coating, and joining. The two parts of the pipe route construction are 12 to 15% complete. In addition to actual pipelaying operations, contractors are building access roads to the 11 pump stations, air strips for the three maintenance centers along the route, storage facilities, and terminal projects.

Key concepts: Pipeline (software), Crude oil, Clearing, Pipeline transport, Peninsula, Terminal (telecommunication), Petroleum engineering, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Saudi Arabian crude oil pipeline snaking across Desert Peninsula — Research Paper | ScholarLens