1973Transportation Engineering Journal of ASCERequires access

The Trans-Alaska Pipeline Story

E. L. Patton

Open publisher page 1 citations

Abstract

A group of seven oil companies has formed the Alyeska Pipeline Service Company to design, construct, operate and maintain the trans-Alaska pipeline system. The total pipeline will be approximately 789 miles long, some 641 miles of which will be across federal lands. The project will include pump stations, camp sites for use during construction, airfields for use during both construction and operation of the line, a communications system, and material sites for construction and access roads. The terminal site at Valdez will consist of a tank farm and dock facilities from which ocean-going tankers will transport crude oil to markets. A road will be built for access and the movement of equipment, materials, and personnel during pipeline construction activity, of approximately 373 miles in length. Of the approximately 586,000 sq miles of land in Alaska, the project will utilize about 0.01% of the total.

About this research paper

What this paper is about

A group of seven oil companies has formed the Alyeska Pipeline Service Company to design, construct, operate and maintain the trans-Alaska pipeline system. The total pipeline will be approximately 789 miles long, some 641 miles of which will be across federal lands. The project will include pump stations, camp sites for use during construction, airfields for use during both construction and operation of the line, a communications system, and material sites for construction and access roads. The terminal site at Valdez will consist of a tank farm and dock facilities from which ocean-going tankers will transport crude oil to markets. A road will be built for access and the movement of equipment, materials, and personnel during pipeline construction activity, of approximately 373 miles in length. Of the approximately 586,000 sq miles of land in Alaska, the project will utilize about 0.01% of the total.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A group of seven oil companies has formed the Alyeska Pipeline Service Company to design, construct, operate and maintain the trans-Alaska pipeline system. The total pipeline will be approximately 789 miles long, some 641 miles of which will be across federal lands. The project will include pump stations, camp sites for use during construction, airfields for use during both construction and operation of the line, a communications system, and material sites for construction and access roads. The terminal site at Valdez will consist of a tank farm and dock facilities from which ocean-going tankers will transport crude oil to markets. A road will be built for access and the movement of equipment, materials, and personnel during pipeline construction activity, of approximately 373 miles in length. Of the approximately 586,000 sq miles of land in Alaska, the project will utilize about 0.01% of the total.

Key concepts: Pipeline (software), Pipeline transport, Engineering, Civil engineering, Crude oil, Transport engineering, Terminal (telecommunication), Service (business)

Related papers

Back to paper searchBrowse research topicsOriginal source
The Trans-Alaska Pipeline Story — Research Paper | ScholarLens