Natural-gas-fired CC unit holds NO[sub x] emissions below 9. 0 ppm
G. Grunbeck
Abstract
G. Grunbeck
Abstract
This article describes the East Syracuse generating plant, one of first commercial stations to include LM6000 gas turbines, designed to solve noise and emissions problems. This natural-gas-fired, combined-cycle cogeneration facility provides 97 MW of power to Niagara Mohawk Power Corp and up to 80,000 lb/hr of process steam to a nearby Bristol-Myers Squibb Co plant. The plant's original design had contemplated a base-loaded facility. This stemmed from the original power sales agreement with Niagara Mohawk Power Corp. Flexibility of original design proved advantageous to the East Syracuse (NY) plant when, during the latter stages of construction, the original agreement was renegotiated into a schedulable'' contract. The new agreement now in force, providing for limited dispatch of one of the two gas turbines, is designed around other pre-existing project agreements. Design flexibility and the choice of two gas turbines made the plant capable of meeting dispatch requirements with only minor modifications of plant design and staffing.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This article describes the East Syracuse generating plant, one of first commercial stations to include LM6000 gas turbines, designed to solve noise and emissions problems. This natural-gas-fired, combined-cycle cogeneration facility provides 97 MW of power to Niagara Mohawk Power Corp and up to 80,000 lb/hr of process steam to a nearby Bristol-Myers Squibb Co plant. The plant's original design had contemplated a base-loaded facility. This stemmed from the original power sales agreement with Niagara Mohawk Power Corp. Flexibility of original design proved advantageous to the East Syracuse (NY) plant when, during the latter stages of construction, the original agreement was renegotiated into a schedulable'' contract. The new agreement now in force, providing for limited dispatch of one of the two gas turbines, is designed around other pre-existing project agreements. Design flexibility and the choice of two gas turbines made the plant capable of meeting dispatch requirements with only minor modifications of plant design and staffing.
Key concepts: Natural gas, Power station, Mohawk, Cogeneration, Flexibility (engineering), Engineering, Waste management, Combined cycle