New CC units seamlessly tied into existing cogen plant

Rick Wheeler, D.A. Cromer, T.W. Atkins, R.G. Coburn

Open publisher page 0 citations

Abstract

This article examines how, at Selkirk, two combined-cycle units were added and fully integrated to an existing one. Generating capacity quadrupled, steam output doubled--all without disrupting existing power and steam sales obligations. The Selkirk Phase 2 cogeneration project is a 266-MW natural-gas/distillate-oil-fired combined-cycle (CC) station in Bethlehem, NY, on General Electric Plastics Co.`s (GEP) Selkirk site, near Albany. The project has been expeditiously integrated with its sister plant, Selkirk Phase 1, to provide process steam and power in a highly efficient manner. Selkirk Phase 1, a 93-MW CC cogeneration station was completed in 1992 (POWER, April 1992, p. 169). This facility produces upwards of 400,000 lb/hr of process steam to steam host GEP. Phase 1 power sales are to Niagara Mohawk Power Corp. and Phase-2 sales to Consolidated Edison Co. of New York Inc.

About this research paper

What this paper is about

This article examines how, at Selkirk, two combined-cycle units were added and fully integrated to an existing one. Generating capacity quadrupled, steam output doubled--all without disrupting existing power and steam sales obligations. The Selkirk Phase 2 cogeneration project is a 266-MW natural-gas/distillate-oil-fired combined-cycle (CC) station in Bethlehem, NY, on General Electric Plastics Co.`s (GEP) Selkirk site, near Albany. The project has been expeditiously integrated with its sister plant, Selkirk Phase 1, to provide process steam and power in a highly efficient manner. Selkirk Phase 1, a 93-MW CC cogeneration station was completed in 1992 (POWER, April 1992, p. 169). This facility produces upwards of 400,000 lb/hr of process steam to steam host GEP. Phase 1 power sales are to Niagara Mohawk Power Corp. and Phase-2 sales to Consolidated Edison Co. of New York Inc.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article examines how, at Selkirk, two combined-cycle units were added and fully integrated to an existing one. Generating capacity quadrupled, steam output doubled--all without disrupting existing power and steam sales obligations. The Selkirk Phase 2 cogeneration project is a 266-MW natural-gas/distillate-oil-fired combined-cycle (CC) station in Bethlehem, NY, on General Electric Plastics Co.`s (GEP) Selkirk site, near Albany. The project has been expeditiously integrated with its sister plant, Selkirk Phase 1, to provide process steam and power in a highly efficient manner. Selkirk Phase 1, a 93-MW CC cogeneration station was completed in 1992 (POWER, April 1992, p. 169). This facility produces upwards of 400,000 lb/hr of process steam to steam host GEP. Phase 1 power sales are to Niagara Mohawk Power Corp. and Phase-2 sales to Consolidated Edison Co. of New York Inc.

Key concepts: Cogeneration, Power station, Engineering, Waste management, Thermal power station, Electric power, Power (physics), Environmental science