Repowering cuts air pollution, improves station`s efficiency

K. Daledda

Open publisher page 0 citations

Abstract

This article reports that after rehab plans for 30-yr-old boilers proved untenable, gas-fired combined cycle, with the existing steam turbines retained, was the choice. Large reductions in NO{sub x}, SO{sub 2}, and CO{sub 2} will be benefits. A unique closed-loop cooling system reduces impact on environment in several ways. When the boilers of existing steam Units 1 and 2 at Bergen generating station were in need of major overhaul, Public Service Electric and Gas Co (PSE and G) began analysis of alternatives to the rehab work. Combined-cycle repowering offered several advantages, including improvement in efficiency -- from 28 to 44% -- and important reduction in air-pollutant and thermal emissions. Continued use of a large portion of the existing plant and infrastructure meant added economic advantages for repowering over construction of a new plant. The project which will come on line in 1995, increases station output from 570MW to 650MW. The station operates as a load-following unit, with expected capacity factor of 65% compared with 30% for the old station. For minimum load, one gas turbine (GT) runs at 100% load, with the steam turbine operational. The GTs operate independently, and the ramp up to 100% load is done immediately, whichmore » gives best efficiency and reduces air emissions.« less

About this research paper

What this paper is about

This article reports that after rehab plans for 30-yr-old boilers proved untenable, gas-fired combined cycle, with the existing steam turbines retained, was the choice. Large reductions in NO{sub x}, SO{sub 2}, and CO{sub 2} will be benefits. A unique closed-loop cooling system reduces impact on environment in several ways. When the boilers of existing steam Units 1 and 2 at Bergen generating station were in need of major overhaul, Public Service Electric and Gas Co (PSE and G) began analysis of alternatives to the rehab work. Combined-cycle repowering offered several advantages, including improvement in efficiency -- from 28 to 44% -- and important reduction in air-pollutant and thermal emissions. Continued use of a large portion of the existing plant and infrastructure meant added economic advantages for repowering over construction of a new plant. The project which will come on line in 1995, increases station output from 570MW to 650MW. The station operates as a load-following unit, with expected capacity factor of 65% compared with 30% for the old station. For minimum load, one gas turbine (GT) runs at 100% load, with the steam turbine operational. The GTs operate independently, and the ramp up to 100% load is done immediately, whichmore » gives best efficiency and reduces air emissions.« less

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article reports that after rehab plans for 30-yr-old boilers proved untenable, gas-fired combined cycle, with the existing steam turbines retained, was the choice. Large reductions in NO{sub x}, SO{sub 2}, and CO{sub 2} will be benefits. A unique closed-loop cooling system reduces impact on environment in several ways. When the boilers of existing steam Units 1 and 2 at Bergen generating station were in need of major overhaul, Public Service Electric and Gas Co (PSE and G) began analysis of alternatives to the rehab work. Combined-cycle repowering offered several advantages, including improvement in efficiency -- from 28 to 44% -- and important reduction in air-pollutant and thermal emissions. Continued use of a large portion of the existing plant and infrastructure meant added economic advantages for repowering over construction of a new plant. The project which will come on line in 1995, increases station output from 570MW to 650MW. The station operates as a load-following unit, with expected capacity factor of 65% compared with 30% for the old station. For minimum load, one gas turbine (GT) runs at 100% load, with the steam turbine operational. The GTs operate independently, and the ramp up to 100% load is done immediately, whichmore » gives best efficiency and reduces air emissions.« less

Key concepts: Combined cycle, Steam turbine, Engineering, Thermal power station, Steam-electric power station, Power station, Air pollution, Work (physics)

Related papers

Back to paper searchBrowse research topicsOriginal source
Repowering cuts air pollution, improves station`s efficiency — Research Paper | ScholarLens