Abstract

Conventional train control is performed in the following manner. Train location is detected by wayside signaling facilities, and according to train location, train control signals are indicated to prevent crashes between trains. However, this control requires enormous number of facilities, that means large amount installation and maintenance expenditures. Recent remarkable progress in the field of information technology makes a new train control system where train itself detects its location and communicates with other trains through radio transmission. Development of the new train control system called ATACS started in 1995, the control run tests were conducted in Senseki line at 300 km north of Tokyo from September 1997 to March 1998. This paper describes outline of ATACS and the results of control run rests.

About this research paper

What this paper is about

Conventional train control is performed in the following manner. Train location is detected by wayside signaling facilities, and according to train location, train control signals are indicated to prevent crashes between trains. However, this control requires enormous number of facilities, that means large amount installation and maintenance expenditures. Recent remarkable progress in the field of information technology makes a new train control system where train itself detects its location and communicates with other trains through radio transmission. Development of the new train control system called ATACS started in 1995, the control run tests were conducted in Senseki line at 300 km north of Tokyo from September 1997 to March 1998. This paper describes outline of ATACS and the results of control run rests.

Why it matters

OpenAlex reports 8 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Conventional train control is performed in the following manner. Train location is detected by wayside signaling facilities, and according to train location, train control signals are indicated to prevent crashes between trains. However, this control requires enormous number of facilities, that means large amount installation and maintenance expenditures. Recent remarkable progress in the field of information technology makes a new train control system where train itself detects its location and communicates with other trains through radio transmission. Development of the new train control system called ATACS started in 1995, the control run tests were conducted in Senseki line at 300 km north of Tokyo from September 1997 to March 1998. This paper describes outline of ATACS and the results of control run rests.

Key concepts: Train, Control (management), Automatic train control, Control system, Telecommunications, Line (geometry), Computer science, Engineering