2001•Rolling StockRequires access

Operation Conditions of Tilting Trains on Guangshen Line and Feasibility Discussion of Applying Tilting Trains on Shenda Line

Fu Wing Yu

Open publisher page 0 citations

Abstract

The operation conditions of tilting trains on Guangshen Line are analyzed.The feasibility to apply tilting trains on Shenda Line is discussed from the aspects of equipment,line adapting capacity and passenger flow,etc.

About this research paper

What this paper is about

The operation conditions of tilting trains on Guangshen Line are analyzed.The feasibility to apply tilting trains on Shenda Line is discussed from the aspects of equipment,line adapting capacity and passenger flow,etc.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The operation conditions of tilting trains on Guangshen Line are analyzed.The feasibility to apply tilting trains on Shenda Line is discussed from the aspects of equipment,line adapting capacity and passenger flow,etc.

Key concepts: Train, Line (geometry), Engineering, Railway line, Transport engineering, Mathematics, Geography, Geometry

Related papers

Back to paper searchBrowse research topicsOriginal source
Operation Conditions of Tilting Trains on Guangshen Line and Feasibility Discussion of Applying Tilting Trains on Shenda Line — Research Paper | ScholarLens