STATIONED IN COPENHAGEN

Susanne Pedersen, Kurt Lauritsen

Open publisher page 0 citations

Abstract

The Copenhagen Metro project in Denmark consists of three phases, owned by different partnerships. Phases 1 and 2 consist of a 21-km light railway system. Bored tunnels driven beneath the city centre will account for 8 km, with 2 km of New Austrian Tunnelling method and cut and cover tunnels. The remaining 11 km will run on elevated tracks or at ground level. Construction of the Frederiksberg Metro Station project is part of Phase 2. The base slab, the platform and outer walls are insitu cast concrete structures. The platform roof is made of precast concrete beams and slabs. Details are given of the geology of the area, the structural layout of the station, the concrete specification, the stability of the structure against uplift, the construction of the station, temporary groundwater lowering, noise and vibration monitoring, and safety issues.

About this research paper

What this paper is about

The Copenhagen Metro project in Denmark consists of three phases, owned by different partnerships. Phases 1 and 2 consist of a 21-km light railway system. Bored tunnels driven beneath the city centre will account for 8 km, with 2 km of New Austrian Tunnelling method and cut and cover tunnels. The remaining 11 km will run on elevated tracks or at ground level. Construction of the Frederiksberg Metro Station project is part of Phase 2. The base slab, the platform and outer walls are insitu cast concrete structures. The platform roof is made of precast concrete beams and slabs. Details are given of the geology of the area, the structural layout of the station, the concrete specification, the stability of the structure against uplift, the construction of the station, temporary groundwater lowering, noise and vibration monitoring, and safety issues.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Copenhagen Metro project in Denmark consists of three phases, owned by different partnerships. Phases 1 and 2 consist of a 21-km light railway system. Bored tunnels driven beneath the city centre will account for 8 km, with 2 km of New Austrian Tunnelling method and cut and cover tunnels. The remaining 11 km will run on elevated tracks or at ground level. Construction of the Frederiksberg Metro Station project is part of Phase 2. The base slab, the platform and outer walls are insitu cast concrete structures. The platform roof is made of precast concrete beams and slabs. Details are given of the geology of the area, the structural layout of the station, the concrete specification, the stability of the structure against uplift, the construction of the station, temporary groundwater lowering, noise and vibration monitoring, and safety issues.

Key concepts: Precast concrete, Roof, Engineering, Civil engineering, Slab, Joint (building), Geotechnical engineering, Forensic engineering