GOING DUTCH UNDERGROUND
Stephan Duineveld
Abstract
Stephan Duineveld
Abstract
In 2003, construction began on a new line for the Amsterdam metro in the Netherlands. This connects the northern part of the city via Amsterdam Central station with the southern traffic and rail ring. A new station, Station Buikslotermeerplein, is being built at the northern end of the new line. The station is being built at street level using a reinforced concrete frame. A tunnel will be sunk beneath the existing central station. A tunnel-boring machine will cut a 3.8-km tunnel beneath historic Amsterdam. Three new underground metro stations (Rokin, Vijzelgracht, Ceituurbaan) will be constructed using the cut-and-cover diaphragm wall technique. The diaphragm walls are constructed from heavily reinforced concrete and hold mechanical connections for the slabs and station walls. Reinforced bar with a diameter of 50 mm and Lenton taper thread couplers from Erico were selected. A weldable Lenton coupler connected to the anchor plate was used to overcome the forces transferred to the concrete walls by the floor. A special bending adapter for the reinforcing bar was manufactured.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In 2003, construction began on a new line for the Amsterdam metro in the Netherlands. This connects the northern part of the city via Amsterdam Central station with the southern traffic and rail ring. A new station, Station Buikslotermeerplein, is being built at the northern end of the new line. The station is being built at street level using a reinforced concrete frame. A tunnel will be sunk beneath the existing central station. A tunnel-boring machine will cut a 3.8-km tunnel beneath historic Amsterdam. Three new underground metro stations (Rokin, Vijzelgracht, Ceituurbaan) will be constructed using the cut-and-cover diaphragm wall technique. The diaphragm walls are constructed from heavily reinforced concrete and hold mechanical connections for the slabs and station walls. Reinforced bar with a diameter of 50 mm and Lenton taper thread couplers from Erico were selected. A weldable Lenton coupler connected to the anchor plate was used to overcome the forces transferred to the concrete walls by the floor. A special bending adapter for the reinforcing bar was manufactured.
Key concepts: Engineering, Metro station, Reinforced concrete, Structural engineering, Transport engineering