2012Advanced materials researchRequires access

Optimization of Weir & Dam with Drain Holes in Continuous Casting Slab Tundish

Chao Chen, Guo Cheng, Hai Bo Sun, Xin Chao Wang, Jia Quan Zhang

Open publisher page 4 citations

Abstract

The optimization of the location and height of weir & dam with drain holes in a single-strand continuous casting tundish was carried out from the view of fluid flow characteristics by physical modeling using a 0.4 scaled water model and mathematical modeling study. Considering simultaneously reducing the remaining melt, maximizing the plug flow and avoiding the short circuited flow, the dam with two upwardly inclined drain holes was optimized. The parameters such as location and height of weir & dam Lw/L, Ld/L, Hw/H and Hd/H are important to fluid flow in tundish. Among them, the location and height of dam were more critical to the overall fluid flow in tundish. The gap between weir and dam was also very important, the gap length that smaller than 0.266 will be preferred. The dead region behind the weir was enlarged and the tracer flow through the drain holes of dam was weakened as increasing the gap of weir and dam. In present study, the parameters of the optimized Case7 are Hw/H 0.448 (162/362), Hd/H 0.718 (260/362), Lw/L 0.4 (480/1200) and Ld/L 0.667 (800/1200). For the fluid flow field, the near surface flow which beneficial to inclusions removal existed both above the dam and through the upwardly inclined drain holes. While the case of bottom grooved dam used may lead to short circuited flow through the grooves.

About this research paper

What this paper is about

The optimization of the location and height of weir & dam with drain holes in a single-strand continuous casting tundish was carried out from the view of fluid flow characteristics by physical modeling using a 0.4 scaled water model and mathematical modeling study. Considering simultaneously reducing the remaining melt, maximizing the plug flow and avoiding the short circuited flow, the dam with two upwardly inclined drain holes was optimized. The parameters such as location and height of weir & dam Lw/L, Ld/L, Hw/H and Hd/H are important to fluid flow in tundish. Among them, the location and height of dam were more critical to the overall fluid flow in tundish. The gap between weir and dam was also very important, the gap length that smaller than 0.266 will be preferred. The dead region behind the weir was enlarged and the tracer flow through the drain holes of dam was weakened as increasing the gap of weir and dam. In present study, the parameters of the optimized Case7 are Hw/H 0.448 (162/362), Hd/H 0.718 (260/362), Lw/L 0.4 (480/1200) and Ld/L 0.667 (800/1200). For the fluid flow field, the near surface flow which beneficial to inclusions removal existed both above the dam and through the upwardly inclined drain holes. While the case of bottom grooved dam used may lead to short circuited flow through the grooves.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The optimization of the location and height of weir & dam with drain holes in a single-strand continuous casting tundish was carried out from the view of fluid flow characteristics by physical modeling using a 0.4 scaled water model and mathematical modeling study. Considering simultaneously reducing the remaining melt, maximizing the plug flow and avoiding the short circuited flow, the dam with two upwardly inclined drain holes was optimized. The parameters such as location and height of weir & dam Lw/L, Ld/L, Hw/H and Hd/H are important to fluid flow in tundish. Among them, the location and height of dam were more critical to the overall fluid flow in tundish. The gap between weir and dam was also very important, the gap length that smaller than 0.266 will be preferred. The dead region behind the weir was enlarged and the tracer flow through the drain holes of dam was weakened as increasing the gap of weir and dam. In present study, the parameters of the optimized Case7 are Hw/H 0.448 (162/362), Hd/H 0.718 (260/362), Lw/L 0.4 (480/1200) and Ld/L 0.667 (800/1200). For the fluid flow field, the near surface flow which beneficial to inclusions removal existed both above the dam and through the upwardly inclined drain holes. While the case of bottom grooved dam used may lead to short circuited flow through the grooves.

Key concepts: Tundish, Weir, Flow (mathematics), Water model, Continuous casting, Slab, Geotechnical engineering, Dead zone

Related papers

Back to paper searchBrowse research topicsOriginal source
Optimization of Weir & Dam with Drain Holes in Continuous Casting Slab Tundish — Research Paper | ScholarLens