Technical and Economic Evaluation of China’s Integrated Gasification Combined Cycle: The Case of Yantai Project
Dapeng Liang, Xinpeng Xing, Wei-Dong SHEN
Abstract
Open-access reader
Dapeng Liang, Xinpeng Xing, Wei-Dong SHEN
Abstract
Open-access reader
Due to the advantages such as high efficiency of electricity generation and high degree of cleanness, Integrated Gasification Combined Cycle (IGCC) power plant represents the direction of development for all fired power plants in China. This essay analyzes the technical requirements and economic attributes of the Chinese IGCC power plant of 400 MW level in plan. It is both necessary and possible for China to develop IGCC power plant with the technical foundation available. The biggest obstacle facing the development of IGCC is the huge amount of investment and high cost of electric generation. According to the sensitivity analysis, investment is the main element affecting the cost of power generation. Though it is difficult to control investment in the present phase, with restricting elements like technique and facility, smooth operation of the project could still be ensured through government’s preferential policies toward IGCC power plant, such as setting price for clean electricity, offering investment subsidies and preferential taxes. The premise for such policies is a determined and consistent development strategy of IGCC technique.
OpenAlex reports 5 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Due to the advantages such as high efficiency of electricity generation and high degree of cleanness, Integrated Gasification Combined Cycle (IGCC) power plant represents the direction of development for all fired power plants in China. This essay analyzes the technical requirements and economic attributes of the Chinese IGCC power plant of 400 MW level in plan. It is both necessary and possible for China to develop IGCC power plant with the technical foundation available. The biggest obstacle facing the development of IGCC is the huge amount of investment and high cost of electric generation. According to the sensitivity analysis, investment is the main element affecting the cost of power generation. Though it is difficult to control investment in the present phase, with restricting elements like technique and facility, smooth operation of the project could still be ensured through government’s preferential policies toward IGCC power plant, such as setting price for clean electricity, offering investment subsidies and preferential taxes. The premise for such policies is a determined and consistent development strategy of IGCC technique.
Key concepts: Integrated gasification combined cycle, Electricity generation, Power station, Investment (military), Electricity, Combined cycle, Environmental economics, Engineering