Character Analyzing and Parameter Optimizing of Main Power Equipments in 200MW Class IGCC Plant

LI Shuo-ping

Open publisher page 0 citations

Abstract

The paper analyze the characteristics of main power equipments including gas turbine,HRSG and steam turbine in 200MW class IGCC plant using coal water mixture gasification technology.The plant efficiency is improved by matching and optimizing the steam-water cycle type,the main steam pressure and temperature and the HRSG exhaust temperature.

About this research paper

What this paper is about

The paper analyze the characteristics of main power equipments including gas turbine,HRSG and steam turbine in 200MW class IGCC plant using coal water mixture gasification technology.The plant efficiency is improved by matching and optimizing the steam-water cycle type,the main steam pressure and temperature and the HRSG exhaust temperature.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The paper analyze the characteristics of main power equipments including gas turbine,HRSG and steam turbine in 200MW class IGCC plant using coal water mixture gasification technology.The plant efficiency is improved by matching and optimizing the steam-water cycle type,the main steam pressure and temperature and the HRSG exhaust temperature.

Key concepts: Integrated gasification combined cycle, Combined cycle, Steam turbine, Process engineering, Steam-electric power station, Engineering, Power station, Coal

Related papers

Back to paper searchBrowse research topicsOriginal source
Character Analyzing and Parameter Optimizing of Main Power Equipments in 200MW Class IGCC Plant — Research Paper | ScholarLens