1998•대한설비공학회 학술발표대회논문집Requires access

석탄가스화 복합 발전 사이클의 공정 설계 및 성능 평가

김용철, 이찬

Open publisher page 0 citations

Abstract

Process simulations by using Gate/Cycle are carried out for designing and optimizing the combined cycle of IGCC power plant. The steam cycle is consider to integrate with IGCC power plant, the coal gasification process of Destec, prenflo, Shell or Texaco with the cold gas clean-up unit. The heat source of the steam cycle is assumed as the MS7FA gas turbine model of General Electric company. The present simulation results give the comparative design base required for the optimal process design of commercial IGCC power plant.

About this research paper

What this paper is about

Process simulations by using Gate/Cycle are carried out for designing and optimizing the combined cycle of IGCC power plant. The steam cycle is consider to integrate with IGCC power plant, the coal gasification process of Destec, prenflo, Shell or Texaco with the cold gas clean-up unit. The heat source of the steam cycle is assumed as the MS7FA gas turbine model of General Electric company. The present simulation results give the comparative design base required for the optimal process design of commercial IGCC power plant.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Process simulations by using Gate/Cycle are carried out for designing and optimizing the combined cycle of IGCC power plant. The steam cycle is consider to integrate with IGCC power plant, the coal gasification process of Destec, prenflo, Shell or Texaco with the cold gas clean-up unit. The heat source of the steam cycle is assumed as the MS7FA gas turbine model of General Electric company. The present simulation results give the comparative design base required for the optimal process design of commercial IGCC power plant.

Key concepts: Integrated gasification combined cycle, Combined cycle, Power station, Steam turbine, Engineering, Coal, Process engineering, Coal gasification