2011Applied Mechanics and MaterialsOpen access

Analysis and Prediction for Xiaolangdi Reservoir Sand Blocking Operation Period and Water Level of the Lower Yellow River

Qing An Li, Han Dong Liu, Yu Kun Zhao

Open full text 2 citations

Abstract

Xiaolangdi Reservoir undertakes 90% of the Yellow River runoff and 100% of sediment discharge. To ensure the long-term utilization of Xiaolangdi reservoir is the key to prevent the flood in the lower reaches of the Yellow River. Take Luokou Hydrologic Station located in the lower reaches of the Yellow River as an example, conduct an analysis from the aspects of sediment retaining of Xiaolangdi Reservoir, scouring and deposition condition of river channel in the lower reaches of the Yellow River, water level performance for years of different flow of ten times’ water-sediment regulation, predict on the sand blocking operation period of Xiaolangdi Reservoir, water level of specific flow of river channel in the lower reaches of the Yellow River and scouring and deposition condition of river channel, which has played a reference role for the flood control in the lower reaches of the Yellow River.

About this research paper

What this paper is about

Xiaolangdi Reservoir undertakes 90% of the Yellow River runoff and 100% of sediment discharge. To ensure the long-term utilization of Xiaolangdi reservoir is the key to prevent the flood in the lower reaches of the Yellow River. Take Luokou Hydrologic Station located in the lower reaches of the Yellow River as an example, conduct an analysis from the aspects of sediment retaining of Xiaolangdi Reservoir, scouring and deposition condition of river channel in the lower reaches of the Yellow River, water level performance for years of different flow of ten times’ water-sediment regulation, predict on the sand blocking operation period of Xiaolangdi Reservoir, water level of specific flow of river channel in the lower reaches of the Yellow River and scouring and deposition condition of river channel, which has played a reference role for the flood control in the lower reaches of the Yellow River.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Xiaolangdi Reservoir undertakes 90% of the Yellow River runoff and 100% of sediment discharge. To ensure the long-term utilization of Xiaolangdi reservoir is the key to prevent the flood in the lower reaches of the Yellow River. Take Luokou Hydrologic Station located in the lower reaches of the Yellow River as an example, conduct an analysis from the aspects of sediment retaining of Xiaolangdi Reservoir, scouring and deposition condition of river channel in the lower reaches of the Yellow River, water level performance for years of different flow of ten times’ water-sediment regulation, predict on the sand blocking operation period of Xiaolangdi Reservoir, water level of specific flow of river channel in the lower reaches of the Yellow River and scouring and deposition condition of river channel, which has played a reference role for the flood control in the lower reaches of the Yellow River.

Key concepts: Hydrology (agriculture), Channel (broadcasting), Surface runoff, Deposition (geology), Sediment, Flood myth, Flood control, River regime

Related papers

Back to paper searchBrowse research topicsOriginal source
Analysis and Prediction for Xiaolangdi Reservoir Sand Blocking Operation Period and Water Level of the Lower Yellow River — Research Paper | ScholarLens