2013Unpublished venueRequires access

Insulation coordination optimization study for ±800kV UHVDC project with increased transmission capacity

Zhang Cuixia, Zhang Liuchun

Open publisher page 4 citations

Abstract

the UHVDC transmission systems have the advantages of long-distance and high-capacity power transmission capability, in order to better play the advantages of the UHVDC transmission systems mentioned above, State Grid Corporation of China (SGCC) proposed to increase the transmission capacity of ±800kV UHVDC transmission system, and increase the bipolar rated capacity from 7200MW to 7600MW. Based on the researched results of overvoltages in ±800kV UHVDC transmission system with the capacity of 7600MW, the insulation coordination for this transmission system is researched, and the obtained results are compared with that for ±800 kV UHVDC transmission system with the capacity of 7200MW. The researched results can be refered by the planed ±800 kV UHVDC transmission systems of China.

About this research paper

What this paper is about

the UHVDC transmission systems have the advantages of long-distance and high-capacity power transmission capability, in order to better play the advantages of the UHVDC transmission systems mentioned above, State Grid Corporation of China (SGCC) proposed to increase the transmission capacity of ±800kV UHVDC transmission system, and increase the bipolar rated capacity from 7200MW to 7600MW. Based on the researched results of overvoltages in ±800kV UHVDC transmission system with the capacity of 7600MW, the insulation coordination for this transmission system is researched, and the obtained results are compared with that for ±800 kV UHVDC transmission system with the capacity of 7200MW. The researched results can be refered by the planed ±800 kV UHVDC transmission systems of China.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

the UHVDC transmission systems have the advantages of long-distance and high-capacity power transmission capability, in order to better play the advantages of the UHVDC transmission systems mentioned above, State Grid Corporation of China (SGCC) proposed to increase the transmission capacity of ±800kV UHVDC transmission system, and increase the bipolar rated capacity from 7200MW to 7600MW. Based on the researched results of overvoltages in ±800kV UHVDC transmission system with the capacity of 7600MW, the insulation coordination for this transmission system is researched, and the obtained results are compared with that for ±800 kV UHVDC transmission system with the capacity of 7200MW. The researched results can be refered by the planed ±800 kV UHVDC transmission systems of China.

Key concepts: Transmission (telecommunications), Transmission system, Power transmission, Electrical engineering, Engineering, Grid, Automotive engineering, Power (physics)

Related papers

Back to paper searchBrowse research topicsOriginal source
Insulation coordination optimization study for ±800kV UHVDC project with increased transmission capacity — Research Paper | ScholarLens