1987•Middle East Oil ShowRequires access

The Evolution of Khuff Completion

S. A. Al-Khayat, Moona Mohammed

Open publisher page 4 citations

Abstract

ABSTRACT This paper reviews the changes and improvements in the design of Khuff Well completions in Bahrain; functions of the components will be emphasized and their performance evaluated. In general, there have been three basic completion designs. Early wells have 5" liner Cemented across the Khuff zones with 5" tubing tied back from the liner to the surface. Subse quent wells were completed with 7" casing with a mechanical set seal bore packer and 5" tubing anchored to it. The latest group of wells are equipped with hydraulic set packers and the tubing is tied back through a floating seal assembly to allow for movement. All designs use various configurations of landing nipples below and above the liner or packer seal assembly. Early designs also utili zed a sliding side door sleeve (circulating device) above the seal assembly. The later designs incorporate a landing nipple below a perforated pup in the tail section for flowing bottom hole pressure measurements.

About this research paper

What this paper is about

ABSTRACT This paper reviews the changes and improvements in the design of Khuff Well completions in Bahrain; functions of the components will be emphasized and their performance evaluated. In general, there have been three basic completion designs. Early wells have 5" liner Cemented across the Khuff zones with 5" tubing tied back from the liner to the surface. Subse quent wells were completed with 7" casing with a mechanical set seal bore packer and 5" tubing anchored to it. The latest group of wells are equipped with hydraulic set packers and the tubing is tied back through a floating seal assembly to allow for movement. All designs use various configurations of landing nipples below and above the liner or packer seal assembly. Early designs also utili zed a sliding side door sleeve (circulating device) above the seal assembly. The later designs incorporate a landing nipple below a perforated pup in the tail section for flowing bottom hole pressure measurements.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

ABSTRACT This paper reviews the changes and improvements in the design of Khuff Well completions in Bahrain; functions of the components will be emphasized and their performance evaluated. In general, there have been three basic completion designs. Early wells have 5" liner Cemented across the Khuff zones with 5" tubing tied back from the liner to the surface. Subse quent wells were completed with 7" casing with a mechanical set seal bore packer and 5" tubing anchored to it. The latest group of wells are equipped with hydraulic set packers and the tubing is tied back through a floating seal assembly to allow for movement. All designs use various configurations of landing nipples below and above the liner or packer seal assembly. Early designs also utili zed a sliding side door sleeve (circulating device) above the seal assembly. The later designs incorporate a landing nipple below a perforated pup in the tail section for flowing bottom hole pressure measurements.

Key concepts: Seal (emblem), Completion (oil and gas wells), Casing, Wellbore, Petroleum engineering, Geology, Hydraulic pressure, Section (typography)

Related papers

Back to paper searchBrowse research topicsOriginal source
The Evolution of Khuff Completion — Research Paper | ScholarLens