Completion Technique of Sidetracked Horizontal Well

Qingjun Cai, Zhiqi Zhou, Zenglin Wang, Fengtao Hu, Leixiang Li

Open publisher page 0 citations

Abstract

Abstract In order to raise the recovery ratio of maturing field, Shengli Petroleum Administration has carried out a project of sidetracking horizontal wells in existing straight wells from the latter of 1995. This paper will introduce the completion technique used to sidetrack horizontal wells within 5 1/2in casing including geologic condition, reservoir type, selection and design of completion type, researches and design of completion tubing along with downhole tools and wellbore treatment etc.. In addition, the question of reservoir protection is discussed, and a few conclusions were made. P. 399

About this research paper

What this paper is about

Abstract In order to raise the recovery ratio of maturing field, Shengli Petroleum Administration has carried out a project of sidetracking horizontal wells in existing straight wells from the latter of 1995. This paper will introduce the completion technique used to sidetrack horizontal wells within 5 1/2in casing including geologic condition, reservoir type, selection and design of completion type, researches and design of completion tubing along with downhole tools and wellbore treatment etc.. In addition, the question of reservoir protection is discussed, and a few conclusions were made. P. 399

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract In order to raise the recovery ratio of maturing field, Shengli Petroleum Administration has carried out a project of sidetracking horizontal wells in existing straight wells from the latter of 1995. This paper will introduce the completion technique used to sidetrack horizontal wells within 5 1/2in casing including geologic condition, reservoir type, selection and design of completion type, researches and design of completion tubing along with downhole tools and wellbore treatment etc.. In addition, the question of reservoir protection is discussed, and a few conclusions were made. P. 399

Key concepts: Completion (oil and gas wells), Casing, Wellbore, Petroleum engineering, Oil field, Geology, Petroleum, Directional drilling