Slim Hole Microclearance Well Completion Technique
Zhao Guoo-xi, Liu Shao-ping
Abstract
Zhao Guoo-xi, Liu Shao-ping
Abstract
The basic procedures and methods for slim hole microclearance well completion are introduced. It is considered that preparation is made by casing running down, selecting wellbore, proper water drilling fluid, casing and tool accessories are prepared, casing is 101.6ram or 104.8mm,casing is run down by using stand, its running speed is 1.5~2min/1 stand. Techniques for improving cementing quality are also analyzed in detail.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The basic procedures and methods for slim hole microclearance well completion are introduced. It is considered that preparation is made by casing running down, selecting wellbore, proper water drilling fluid, casing and tool accessories are prepared, casing is 101.6ram or 104.8mm,casing is run down by using stand, its running speed is 1.5~2min/1 stand. Techniques for improving cementing quality are also analyzed in detail.
Key concepts: Casing, Completion (oil and gas wells), Petroleum engineering, Wellbore, Drilling, Engineering, Mechanical engineering