The Design of Blasting Demolition of the Reinforced Concrete Chimney Based on Complicated Conditions
Chun Li Zhang, Bo Wang, Yan Zhi Zhu
Abstract
Chun Li Zhang, Bo Wang, Yan Zhi Zhu
Abstract
Reinforced concrete chimney lining initiation time should be slightly behind the outer wall. Adopting blasting scheme of preliminary demolition and big blasting cut is helpful to control the collapse of chimney and reduce the blasting vibration directions. Combined with a real blasting engineering, blasting demolition design of the reinforced concrete chimney under complex environmental condition was introduced.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Reinforced concrete chimney lining initiation time should be slightly behind the outer wall. Adopting blasting scheme of preliminary demolition and big blasting cut is helpful to control the collapse of chimney and reduce the blasting vibration directions. Combined with a real blasting engineering, blasting demolition design of the reinforced concrete chimney under complex environmental condition was introduced.
Key concepts: Demolition, Chimney (locomotive), Rock blasting, Reinforced concrete, Engineering, Geotechnical engineering, Structural engineering, Civil engineering