Directional blasting demolition of a 45m high chimney by controlled in complex environment
Cheng Gui-ha
Abstract
Cheng Gui-ha
Abstract
This article introduced an example of a 45 m high brick chimney directional demolition.The chimney was located in the complex environment and the requirement for precision of directional collapse of the chimney was very critical.Gave the demolition scheme,the demolition parameter,the pretreatment,the safety protection measure and the blasting effect,then provided the guidance for the similar demolition project.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This article introduced an example of a 45 m high brick chimney directional demolition.The chimney was located in the complex environment and the requirement for precision of directional collapse of the chimney was very critical.Gave the demolition scheme,the demolition parameter,the pretreatment,the safety protection measure and the blasting effect,then provided the guidance for the similar demolition project.
Key concepts: Demolition, Chimney (locomotive), Rock blasting, Brick, Mining engineering, Engineering, Measure (data warehouse), Environmental science