Northern border eastern leg construction now underway

J.C. Pyle

Open publisher page 0 citations

Abstract

As part of the 4800-mile Alaska Natural Gas Transportation System (ANGTS), the 823-mile eastern US leg will stretch from Morgan, Montana, to Ventura, La., and eventually will extend another 308 miles to Dwight, Illinois. Northern Border Pipeline Co. has employed five contractors to lay the 42-in-diam, 1435-psig line, which is scheduled for fall 1982 completion. Nine construction spreads comprise the length of the leg; work on six of the spreads began in May 1981. Extensive federal regulations have slowed the project at every stage.

About this research paper

What this paper is about

As part of the 4800-mile Alaska Natural Gas Transportation System (ANGTS), the 823-mile eastern US leg will stretch from Morgan, Montana, to Ventura, La., and eventually will extend another 308 miles to Dwight, Illinois. Northern Border Pipeline Co. has employed five contractors to lay the 42-in-diam, 1435-psig line, which is scheduled for fall 1982 completion. Nine construction spreads comprise the length of the leg; work on six of the spreads began in May 1981. Extensive federal regulations have slowed the project at every stage.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

As part of the 4800-mile Alaska Natural Gas Transportation System (ANGTS), the 823-mile eastern US leg will stretch from Morgan, Montana, to Ventura, La., and eventually will extend another 308 miles to Dwight, Illinois. Northern Border Pipeline Co. has employed five contractors to lay the 42-in-diam, 1435-psig line, which is scheduled for fall 1982 completion. Nine construction spreads comprise the length of the leg; work on six of the spreads began in May 1981. Extensive federal regulations have slowed the project at every stage.

Key concepts: Mile, Work (physics), Natural gas, Engineering, Pipeline (software), Archaeology, Forensic engineering, Geography

Related papers

Back to paper searchBrowse research topicsOriginal source
Northern border eastern leg construction now underway — Research Paper | ScholarLens