Going for the last drop
J.R. McColl
Abstract
J.R. McColl
Abstract
One of the most ambitious secondary recovery operations ever attempted is now being constructed by Abu Dhabi Marine Areas Ltd. for its offshore reservoirs in the Arabian Gulf. Abu Dhabi Marine Areas Ltd., an international consortium of British, French, Japanese, and Middle Eastern interests, decided last year to prevent production of excessive gas and halt declining production by installing a system for high-pressure seawater injection. Initially, the reservoir's existing 40 producing wells will be supported by 4 water-injection complexes, each with up to 7 boreholes. When the project is complete, there may be up to 48 more production wells in the reservoir with 83 injection bores, giving an output of 700,000 bpd of oil and needing 1,400,000 bpd of water (the difference between the quantities is due to presence of gas in the oil). The second, somewhat smaller ADMA reservoir, which has so far shown no signs of deterioration, is also to have a waterflooding scheme installed consisting of 2 injection complexes. Production of 500,000 bpd is planned, requiring the injection of 1,000,000 bpd of water. Total cost of the project is expected to be in the region of $1.1 billion.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
One of the most ambitious secondary recovery operations ever attempted is now being constructed by Abu Dhabi Marine Areas Ltd. for its offshore reservoirs in the Arabian Gulf. Abu Dhabi Marine Areas Ltd., an international consortium of British, French, Japanese, and Middle Eastern interests, decided last year to prevent production of excessive gas and halt declining production by installing a system for high-pressure seawater injection. Initially, the reservoir's existing 40 producing wells will be supported by 4 water-injection complexes, each with up to 7 boreholes. When the project is complete, there may be up to 48 more production wells in the reservoir with 83 injection bores, giving an output of 700,000 bpd of oil and needing 1,400,000 bpd of water (the difference between the quantities is due to presence of gas in the oil). The second, somewhat smaller ADMA reservoir, which has so far shown no signs of deterioration, is also to have a waterflooding scheme installed consisting of 2 injection complexes. Production of 500,000 bpd is planned, requiring the injection of 1,000,000 bpd of water. Total cost of the project is expected to be in the region of $1.1 billion.
Key concepts: Abu dhabi, Submarine pipeline, Water injection (oil production), Petroleum engineering, Completion (oil and gas wells), Oil production, Borehole, Fossil fuel