1977Oil & gas journal/Oil and gas journalRequires access

Water used for Abu Dhabi injection expansion will be gas-lifted

James L. Kennedy

Open publisher page 0 citations

Abstract

In 3 of its 4 major oil-producing fields, Abu Dhabi Petroleum Co. (ADPC) plans to replace all reservoir voidage by water injection. The aim is to maintain the reservoir pressure above the bubble point in all 3 fields. To do this, ADPC is expanding its water-injection capability. Two projects--one each in Asab field and in Bab field--were virtually complete at the end of last year. A dump injection scheme also is being converted to powered injection in the Bu Hasa field where injection water will be produced from source wells using gas lift. That project is expected to be complete at the end of this year. In the Sahil field, now being developed, it is planned to start water injection when reservoir pressure has declined.

About this research paper

What this paper is about

In 3 of its 4 major oil-producing fields, Abu Dhabi Petroleum Co. (ADPC) plans to replace all reservoir voidage by water injection. The aim is to maintain the reservoir pressure above the bubble point in all 3 fields. To do this, ADPC is expanding its water-injection capability. Two projects--one each in Asab field and in Bab field--were virtually complete at the end of last year. A dump injection scheme also is being converted to powered injection in the Bu Hasa field where injection water will be produced from source wells using gas lift. That project is expected to be complete at the end of this year. In the Sahil field, now being developed, it is planned to start water injection when reservoir pressure has declined.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In 3 of its 4 major oil-producing fields, Abu Dhabi Petroleum Co. (ADPC) plans to replace all reservoir voidage by water injection. The aim is to maintain the reservoir pressure above the bubble point in all 3 fields. To do this, ADPC is expanding its water-injection capability. Two projects--one each in Asab field and in Bab field--were virtually complete at the end of last year. A dump injection scheme also is being converted to powered injection in the Bu Hasa field where injection water will be produced from source wells using gas lift. That project is expected to be complete at the end of this year. In the Sahil field, now being developed, it is planned to start water injection when reservoir pressure has declined.

Key concepts: Water injection (oil production), Abu dhabi, Petroleum engineering, Injection well, Gas lift, Produced water, Petroleum, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Water used for Abu Dhabi injection expansion will be gas-lifted — Research Paper | ScholarLens