2012Water and Energy InternationalRequires access

1200 kV national test station: taking Indian Power System to next orbit

Sunilkumar Agrawal, D.P. Tamoli, Brinda Bhowmick, B.N.V.R.C. Suresh Kumar, Sachin B. Rao, Akhil Sundaran

Open publisher page 1 citations

Abstract

To facilitate the indigenous development of 1200 kV Ultra High Voltage AC technology in India, POWERGRID in association with Indian manufacturers are establishing a 1200 kV Test Station at Bina in the state of Madhya Pradesh, India. Out of two 1200 kV bays, one bay is already charged along with the 1200 kV Single Circuit and Double Circuit lines and field tests and studies are ongoing at the test station.

About this research paper

What this paper is about

To facilitate the indigenous development of 1200 kV Ultra High Voltage AC technology in India, POWERGRID in association with Indian manufacturers are establishing a 1200 kV Test Station at Bina in the state of Madhya Pradesh, India. Out of two 1200 kV bays, one bay is already charged along with the 1200 kV Single Circuit and Double Circuit lines and field tests and studies are ongoing at the test station.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

To facilitate the indigenous development of 1200 kV Ultra High Voltage AC technology in India, POWERGRID in association with Indian manufacturers are establishing a 1200 kV Test Station at Bina in the state of Madhya Pradesh, India. Out of two 1200 kV bays, one bay is already charged along with the 1200 kV Single Circuit and Double Circuit lines and field tests and studies are ongoing at the test station.

Key concepts: Bay, Engineering, Electrical engineering, Indigenous, Test (biology), Telecommunications, High voltage, Voltage

Related papers

Back to paper searchBrowse research topicsOriginal source
1200 kV national test station: taking Indian Power System to next orbit — Research Paper | ScholarLens