Gas turbine procurement: 1987 workshop: Final report

Charles F. Sanders, G.E. Dusatko

Open publisher page 0 citations

Abstract

A workshop addressing reliability, availability, and maintainability, in electric utility gas turbine procurement, was held in East Windsor, Connecticut, on October 12--13, 1988. A total of 49 utility personnel representing 25 electric utilities attended. Additional participants were representatives from the Electric Power Research Institute (sponsors of the workshop), invited speakers, and Energy Systems Associates (ESA), the organization that conducted the workshop. Seven presentations were given, highlighting actual utility experiences in gas turbine procurement. The presentations addressed reliability, availability, and maintainability (RAM), bid evaluations, and repowering options and considerations. New to the workshops in 1988 was one half-day devoted entirely to warranties, presented by an EPRI contractor. Individual projects are processed separately for the data bases.

About this research paper

What this paper is about

A workshop addressing reliability, availability, and maintainability, in electric utility gas turbine procurement, was held in East Windsor, Connecticut, on October 12--13, 1988. A total of 49 utility personnel representing 25 electric utilities attended. Additional participants were representatives from the Electric Power Research Institute (sponsors of the workshop), invited speakers, and Energy Systems Associates (ESA), the organization that conducted the workshop. Seven presentations were given, highlighting actual utility experiences in gas turbine procurement. The presentations addressed reliability, availability, and maintainability (RAM), bid evaluations, and repowering options and considerations. New to the workshops in 1988 was one half-day devoted entirely to warranties, presented by an EPRI contractor. Individual projects are processed separately for the data bases.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A workshop addressing reliability, availability, and maintainability, in electric utility gas turbine procurement, was held in East Windsor, Connecticut, on October 12--13, 1988. A total of 49 utility personnel representing 25 electric utilities attended. Additional participants were representatives from the Electric Power Research Institute (sponsors of the workshop), invited speakers, and Energy Systems Associates (ESA), the organization that conducted the workshop. Seven presentations were given, highlighting actual utility experiences in gas turbine procurement. The presentations addressed reliability, availability, and maintainability (RAM), bid evaluations, and repowering options and considerations. New to the workshops in 1988 was one half-day devoted entirely to warranties, presented by an EPRI contractor. Individual projects are processed separately for the data bases.

Key concepts: Procurement, Maintainability, Electric utility, Engineering, Electric power, Reliability (semiconductor), Gas turbines, Operations management