1984OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)Requires access

All-American pipeline work to start in 1985

O. Klinger

Open publisher page 0 citations

Abstract

Progress being made in the planning for an early 1985 start of construction of the all American Pipeline Co. heated oil pipeline system is discussed. This 30-in. system will be the largest oil pipeline built in the US in many years. The main line from Emidio, CA near Bakersfield, to McCamey, in West Texas will be 1207.9 miles long. Also being planned is a new 451-mile extension from McCamey to Freeport, Texas, on the Gulf Coast. The construction timetable and the estimated investment and operating costs for the pipe-line are given.

About this research paper

What this paper is about

Progress being made in the planning for an early 1985 start of construction of the all American Pipeline Co. heated oil pipeline system is discussed. This 30-in. system will be the largest oil pipeline built in the US in many years. The main line from Emidio, CA near Bakersfield, to McCamey, in West Texas will be 1207.9 miles long. Also being planned is a new 451-mile extension from McCamey to Freeport, Texas, on the Gulf Coast. The construction timetable and the estimated investment and operating costs for the pipe-line are given.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Progress being made in the planning for an early 1985 start of construction of the all American Pipeline Co. heated oil pipeline system is discussed. This 30-in. system will be the largest oil pipeline built in the US in many years. The main line from Emidio, CA near Bakersfield, to McCamey, in West Texas will be 1207.9 miles long. Also being planned is a new 451-mile extension from McCamey to Freeport, Texas, on the Gulf Coast. The construction timetable and the estimated investment and operating costs for the pipe-line are given.

Key concepts: Pipeline (software), Pipeline transport, Mile, Work (physics), Engineering, Investment (military), Geography, Political science

Related papers

Back to paper searchBrowse research topicsOriginal source
All-American pipeline work to start in 1985 — Research Paper | ScholarLens