1979•Proc., Annu. Offshore Technol. Conf.; (United States)Requires access

First year's operation experience of the deepest SPM (Single Point Mooring) in the world

Joshua Millar, H. Hughes, R.C. Dyer

Open publisher page 0 citations

Abstract

The British National Oil Corp. had a Single Anchor Leg Mooring (SALM) installed at the Thistle Field in Apr. 1977 for export loading of tankers pending completion of the Brent System 36 in. pipeline to Sullom-Voe, which became operational in Dec. 1978; the SALM will continue to be maintained in good condition as a standby alternative export outlet. Modification of the original three 80,000 dwt tankers during 1977 provided the original design capacity of an 80,000 dwt tanker, but with added clean ballast capacity to eliminate tank cleaning and treatment of dirty ballast water. A fully integrated tanker/SALM/platform instrumentation system monitors mooring loads, buoy and riser angles, and tanker status; the latter being radio telemetered to the nearby block platform. Operation of the system and necessary modifications are described.

About this research paper

What this paper is about

The British National Oil Corp. had a Single Anchor Leg Mooring (SALM) installed at the Thistle Field in Apr. 1977 for export loading of tankers pending completion of the Brent System 36 in. pipeline to Sullom-Voe, which became operational in Dec. 1978; the SALM will continue to be maintained in good condition as a standby alternative export outlet. Modification of the original three 80,000 dwt tankers during 1977 provided the original design capacity of an 80,000 dwt tanker, but with added clean ballast capacity to eliminate tank cleaning and treatment of dirty ballast water. A fully integrated tanker/SALM/platform instrumentation system monitors mooring loads, buoy and riser angles, and tanker status; the latter being radio telemetered to the nearby block platform. Operation of the system and necessary modifications are described.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The British National Oil Corp. had a Single Anchor Leg Mooring (SALM) installed at the Thistle Field in Apr. 1977 for export loading of tankers pending completion of the Brent System 36 in. pipeline to Sullom-Voe, which became operational in Dec. 1978; the SALM will continue to be maintained in good condition as a standby alternative export outlet. Modification of the original three 80,000 dwt tankers during 1977 provided the original design capacity of an 80,000 dwt tanker, but with added clean ballast capacity to eliminate tank cleaning and treatment of dirty ballast water. A fully integrated tanker/SALM/platform instrumentation system monitors mooring loads, buoy and riser angles, and tanker status; the latter being radio telemetered to the nearby block platform. Operation of the system and necessary modifications are described.

Key concepts: Mooring, Marine engineering, Buoy, Ballast, Engineering, Pipeline (software), Pipeline transport, Block (permutation group theory)