EXPERIENCE OF A SINGLE BUOY MOORING SYSTEM
Geoff Hubbard
Abstract
Geoff Hubbard
Abstract
A single buoy mooring system was installed (from decision to install to completion) in one year by February 1967, to hold tankers up to 165 dwt in winds up to 40 knots. So far a 192,000 dwt tanker has been partially loaded and a 160,000 dwt tanker totally loaded. The system was out of active use for 70 days in 1967 and 35 days in 1968. For the future it must be considered whether this design can be used for tankers up to 500,000 dwt. Problems experienced with the system are discussed.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
A single buoy mooring system was installed (from decision to install to completion) in one year by February 1967, to hold tankers up to 165 dwt in winds up to 40 knots. So far a 192,000 dwt tanker has been partially loaded and a 160,000 dwt tanker totally loaded. The system was out of active use for 70 days in 1967 and 35 days in 1968. For the future it must be considered whether this design can be used for tankers up to 500,000 dwt. Problems experienced with the system are discussed.
Key concepts: Buoy, Mooring, Marine engineering, Engineering, Environmental science