Offshore gas plant, unique storage due west Java Sea
James L. Kennedy
Abstract
James L. Kennedy
Abstract
The Arjuna complex fields operated by ARCO in partnership with Pertamina in Indonesia's Java Sea are still growing. Four areas are producing, and two others are being developed. The area is also slated to get some unusual production and processing equipment, including a first-of-a-kind completely offshore natural gas processing plant, and a unique floating concrete LP-gas storage barge. The gas-liquids-extraction plant is expected to be in operation early next year. The 36,000-ton offshore storage unit, being built by Concrete Technology Corp. in Tacoma, Wash., is scheduled to be completed this fall. The concrete barge will store a total of 375,000 bbl of LP-gas at a temperature of -50/sup 0/F.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The Arjuna complex fields operated by ARCO in partnership with Pertamina in Indonesia's Java Sea are still growing. Four areas are producing, and two others are being developed. The area is also slated to get some unusual production and processing equipment, including a first-of-a-kind completely offshore natural gas processing plant, and a unique floating concrete LP-gas storage barge. The gas-liquids-extraction plant is expected to be in operation early next year. The 36,000-ton offshore storage unit, being built by Concrete Technology Corp. in Tacoma, Wash., is scheduled to be completed this fall. The concrete barge will store a total of 375,000 bbl of LP-gas at a temperature of -50/sup 0/F.
Key concepts: BARGE, Submarine pipeline, Natural gas, Java, Environmental science, Waste management, Liquefied natural gas, Engineering