DESIGN AND CONSTRUCTION OF A NEW SERVICE TUNNEL AT EDINBURGH CASTLE . TUNNEL CONSTRUCTION 90. PAPERS PRESENTED AT THE TUNNEL CONSTRUCTION 90 CONFERENCE, ORGANIZED BY THE INSTITUTION OF MINING AND METALLURGY, LONDON, 3-4 APRIL, 1990

T. H. Douglas, S Keeble

Open publisher page 1 citations

Abstract

A 6 M programme is underway at present to improve the facilities for visitors to Edinburgh Castle. Phase I of the project includes a single lane vehicle and services tunnel 200 m long of which 97 m is excavated in rock. The paper outlines the work associated with the 20 cubic metre face area tunnel and concentrates on two special aspects of the work. First, the constraints required to control the blasting of both the open cut and below ground rock excavations which are in very close proximity to historic buildings. Secondly, the tight physical and operational restraints of constructing the tunnel within the environs of a Castle which, during the summer, often caters for 6000 or more tourists per day.(A) For the covering abstract of the conference see IRRD 828810.

About this research paper

What this paper is about

A 6 M programme is underway at present to improve the facilities for visitors to Edinburgh Castle. Phase I of the project includes a single lane vehicle and services tunnel 200 m long of which 97 m is excavated in rock. The paper outlines the work associated with the 20 cubic metre face area tunnel and concentrates on two special aspects of the work. First, the constraints required to control the blasting of both the open cut and below ground rock excavations which are in very close proximity to historic buildings. Secondly, the tight physical and operational restraints of constructing the tunnel within the environs of a Castle which, during the summer, often caters for 6000 or more tourists per day.(A) For the covering abstract of the conference see IRRD 828810.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A 6 M programme is underway at present to improve the facilities for visitors to Edinburgh Castle. Phase I of the project includes a single lane vehicle and services tunnel 200 m long of which 97 m is excavated in rock. The paper outlines the work associated with the 20 cubic metre face area tunnel and concentrates on two special aspects of the work. First, the constraints required to control the blasting of both the open cut and below ground rock excavations which are in very close proximity to historic buildings. Secondly, the tight physical and operational restraints of constructing the tunnel within the environs of a Castle which, during the summer, often caters for 6000 or more tourists per day.(A) For the covering abstract of the conference see IRRD 828810.

Key concepts: Excavation, Rock blasting, Engineering, Work (physics), Drilling and blasting, Service (business), Civil engineering, Mining engineering