1978Unpublished venueRequires access

TRAFFIC AND CONSTRUCTIONAL MEASURES FOR ACCELERATING BUS TRAFFIC IN MUNICH

K Ampenberger

Open publisher page 0 citations

Abstract

TRAMWAYS AND UNDERGROUND RAILWAYS HAVE THEIR OWN PERMANENT SITE: THE MUNICH TRAMS RUN FOR ABOUT 75% OF THEIR JOURNEYS ON THEIR OWN TRACK. DURING RECENT YEARS THE MUNICH FEEDER BUS AUTHORITIES HAVE PROVIDED A TOTAL OF 15.3 KM OF BUS LANES, IN ORDER TO SEPARATE BUSES FROM PRIVATE TRANSPORT DURING THE CONGESTED PEAK PERIODS. BUS LANES WERE DESIGNED FOR A FLOW OF AT LEAST 16 BUSES PER HOUR AND ARE NORMALLY 3.50 M WIDE, BUT IN CERTAIN CASES HAVE A MINIMUM OF 2.90 M. WHEN INSTALLING A BUS LANE, THE SUM OF THE TRAVEL TIME GAINED BY THE PASSENGERS SHOULD EXCEED THE SUM OF THE TRAVEL TIME LOST BY PRIVATE TRAFFIC. A FURTHER 2.3 KM OF BUS LANES ARE PLANNED. THE AUTHOR DESCRIBES A SERIES OF PERMANENT BUS LANES AND TEMPORARY BUS LANES, COMMON BUS AND TRAM TRACKS AND BUS STOP LAYOUTS.

About this research paper

What this paper is about

TRAMWAYS AND UNDERGROUND RAILWAYS HAVE THEIR OWN PERMANENT SITE: THE MUNICH TRAMS RUN FOR ABOUT 75% OF THEIR JOURNEYS ON THEIR OWN TRACK. DURING RECENT YEARS THE MUNICH FEEDER BUS AUTHORITIES HAVE PROVIDED A TOTAL OF 15.3 KM OF BUS LANES, IN ORDER TO SEPARATE BUSES FROM PRIVATE TRANSPORT DURING THE CONGESTED PEAK PERIODS. BUS LANES WERE DESIGNED FOR A FLOW OF AT LEAST 16 BUSES PER HOUR AND ARE NORMALLY 3.50 M WIDE, BUT IN CERTAIN CASES HAVE A MINIMUM OF 2.90 M. WHEN INSTALLING A BUS LANE, THE SUM OF THE TRAVEL TIME GAINED BY THE PASSENGERS SHOULD EXCEED THE SUM OF THE TRAVEL TIME LOST BY PRIVATE TRAFFIC. A FURTHER 2.3 KM OF BUS LANES ARE PLANNED. THE AUTHOR DESCRIBES A SERIES OF PERMANENT BUS LANES AND TEMPORARY BUS LANES, COMMON BUS AND TRAM TRACKS AND BUS STOP LAYOUTS.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

TRAMWAYS AND UNDERGROUND RAILWAYS HAVE THEIR OWN PERMANENT SITE: THE MUNICH TRAMS RUN FOR ABOUT 75% OF THEIR JOURNEYS ON THEIR OWN TRACK. DURING RECENT YEARS THE MUNICH FEEDER BUS AUTHORITIES HAVE PROVIDED A TOTAL OF 15.3 KM OF BUS LANES, IN ORDER TO SEPARATE BUSES FROM PRIVATE TRANSPORT DURING THE CONGESTED PEAK PERIODS. BUS LANES WERE DESIGNED FOR A FLOW OF AT LEAST 16 BUSES PER HOUR AND ARE NORMALLY 3.50 M WIDE, BUT IN CERTAIN CASES HAVE A MINIMUM OF 2.90 M. WHEN INSTALLING A BUS LANE, THE SUM OF THE TRAVEL TIME GAINED BY THE PASSENGERS SHOULD EXCEED THE SUM OF THE TRAVEL TIME LOST BY PRIVATE TRAFFIC. A FURTHER 2.3 KM OF BUS LANES ARE PLANNED. THE AUTHOR DESCRIBES A SERIES OF PERMANENT BUS LANES AND TEMPORARY BUS LANES, COMMON BUS AND TRAM TRACKS AND BUS STOP LAYOUTS.

Key concepts: Transport engineering, Bus priority, Installation, Traffic flow (computer networking), Public transport, Track (disk drive), Engineering, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
TRAFFIC AND CONSTRUCTIONAL MEASURES FOR ACCELERATING BUS TRAFFIC IN MUNICH — Research Paper | ScholarLens