2014RePEc: Research Papers in EconomicsRequires access

Questioning the Soft Budget Constraint

Changlin Luo

Open publisher page 1 citations

Abstract

First, this paper claims that the soft budget constraint is a contradiction in terms by showing that each "soft" budget line is in fact an incorrect one. By classifying the problems that were formerly conglomerated under the name of the "soft budget constraint, " we show that a "hard" budget constraint exists for each specific problem. This leads to the realization that each of these problems originally belonged in a different analytic framework, and does not need to be related to the soft budget constraint. Finally, we illustrate how the former conclusions drawn from the "soft" perspective can be adjusted to form better interpretations under the original frameworks. Hence, we conclude that there is no such thing as the soft budget constraint.

Open-access reader

About this research paper

What this paper is about

First, this paper claims that the soft budget constraint is a contradiction in terms by showing that each "soft" budget line is in fact an incorrect one. By classifying the problems that were formerly conglomerated under the name of the "soft budget constraint, " we show that a "hard" budget constraint exists for each specific problem. This leads to the realization that each of these problems originally belonged in a different analytic framework, and does not need to be related to the soft budget constraint. Finally, we illustrate how the former conclusions drawn from the "soft" perspective can be adjusted to form better interpretations under the original frameworks. Hence, we conclude that there is no such thing as the soft budget constraint.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

First, this paper claims that the soft budget constraint is a contradiction in terms by showing that each "soft" budget line is in fact an incorrect one. By classifying the problems that were formerly conglomerated under the name of the "soft budget constraint, " we show that a "hard" budget constraint exists for each specific problem. This leads to the realization that each of these problems originally belonged in a different analytic framework, and does not need to be related to the soft budget constraint. Finally, we illustrate how the former conclusions drawn from the "soft" perspective can be adjusted to form better interpretations under the original frameworks. Hence, we conclude that there is no such thing as the soft budget constraint.

Key concepts: Budget constraint, Constraint (computer-aided design), Contradiction, Perspective (graphical), Realization (probability), Economics, Mathematical economics, Line (geometry)

Related papers

Back to paper searchBrowse research topicsOriginal source
Questioning the Soft Budget Constraint — Research Paper | ScholarLens