The article examines the new generation of Alstom's Pendolino tilting trains, which, following dynamic test completion at the Czech Republic's Velim test circuit, are due to start mainline testing this month in Italy. The new Pendolinos reach speeds of 250 km/h, and feature better accessibility, improved reliability, and a more spacious interior than their predecessors. Trenitalia has ordered a fleet of 12 ETR 600 trains equipped for operation on 25kV ac high-speed lines and 3kV dc conventional lines for service in Italy from Alstom. Fourteen tri-voltage trains have been purchased by Cisalpino for service on operator routes to 15 kV networks in Switzerland and Germany from Italy beginning in 2007. Train design and components, including bogies, body shell, and signaling systems, are discussed.

About this research paper

What this paper is about

The article examines the new generation of Alstom's Pendolino tilting trains, which, following dynamic test completion at the Czech Republic's Velim test circuit, are due to start mainline testing this month in Italy. The new Pendolinos reach speeds of 250 km/h, and feature better accessibility, improved reliability, and a more spacious interior than their predecessors. Trenitalia has ordered a fleet of 12 ETR 600 trains equipped for operation on 25kV ac high-speed lines and 3kV dc conventional lines for service in Italy from Alstom. Fourteen tri-voltage trains have been purchased by Cisalpino for service on operator routes to 15 kV networks in Switzerland and Germany from Italy beginning in 2007. Train design and components, including bogies, body shell, and signaling systems, are discussed.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The article examines the new generation of Alstom's Pendolino tilting trains, which, following dynamic test completion at the Czech Republic's Velim test circuit, are due to start mainline testing this month in Italy. The new Pendolinos reach speeds of 250 km/h, and feature better accessibility, improved reliability, and a more spacious interior than their predecessors. Trenitalia has ordered a fleet of 12 ETR 600 trains equipped for operation on 25kV ac high-speed lines and 3kV dc conventional lines for service in Italy from Alstom. Fourteen tri-voltage trains have been purchased by Cisalpino for service on operator routes to 15 kV networks in Switzerland and Germany from Italy beginning in 2007. Train design and components, including bogies, body shell, and signaling systems, are discussed.

Key concepts: Bogie, Train, Engineering, Service (business), Automotive engineering, Reliability (semiconductor), Telecommunications, Transport engineering