The San Diego Metropolitan Transit System (MTS) launched service on the initial phase of the San Diego Trolley light-rail system in 1981. The system consisted of a 15.9 mile segment between the U.S.-Mexican border and downtown San Diego. In subsequent years, MTS extended the later-named Blue line and also built what are now known as the Orange and Green lines, which create today’s 53.5-mile double-tracked system. In the 1980s, the trolley was the poster child for modern-day light-rail systems in the United States. But now, the initial phase of the trolley system is more than 30 years old and in need of a facelift. In 2010, MTS launched a four year, $570 million trolley renewal project that was designed to improve on-time performance, modernize stations, upgrade technology, make trains easier to board and even upgrade a freight-rail line. The project calls for the rehabilitation of the Blue and Orange line stations to accommodate low floor vehicles; realigning the Green line to eliminate transfers in downtown San Diego; replacing overhead contact wire, upgrading the 90-lb rail to 115-lb rail; installing fiber optics system-wide; upgrading the signal system and power substations; and rebuilding several grade crossings. Transit stations will also be rehabilitated to feature bike lockers, waiting areas and next-train arrival systems.

About this research paper

What this paper is about

The San Diego Metropolitan Transit System (MTS) launched service on the initial phase of the San Diego Trolley light-rail system in 1981. The system consisted of a 15.9 mile segment between the U.S.-Mexican border and downtown San Diego. In subsequent years, MTS extended the later-named Blue line and also built what are now known as the Orange and Green lines, which create today’s 53.5-mile double-tracked system. In the 1980s, the trolley was the poster child for modern-day light-rail systems in the United States. But now, the initial phase of the trolley system is more than 30 years old and in need of a facelift. In 2010, MTS launched a four year, $570 million trolley renewal project that was designed to improve on-time performance, modernize stations, upgrade technology, make trains easier to board and even upgrade a freight-rail line. The project calls for the rehabilitation of the Blue and Orange line stations to accommodate low floor vehicles; realigning the Green line to eliminate transfers in downtown San Diego; replacing overhead contact wire, upgrading the 90-lb rail to 115-lb rail; installing fiber optics system-wide; upgrading the signal system and power substations; and rebuilding several grade crossings. Transit stations will also be rehabilitated to feature bike lockers, waiting areas and next-train arrival systems.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The San Diego Metropolitan Transit System (MTS) launched service on the initial phase of the San Diego Trolley light-rail system in 1981. The system consisted of a 15.9 mile segment between the U.S.-Mexican border and downtown San Diego. In subsequent years, MTS extended the later-named Blue line and also built what are now known as the Orange and Green lines, which create today’s 53.5-mile double-tracked system. In the 1980s, the trolley was the poster child for modern-day light-rail systems in the United States. But now, the initial phase of the trolley system is more than 30 years old and in need of a facelift. In 2010, MTS launched a four year, $570 million trolley renewal project that was designed to improve on-time performance, modernize stations, upgrade technology, make trains easier to board and even upgrade a freight-rail line. The project calls for the rehabilitation of the Blue and Orange line stations to accommodate low floor vehicles; realigning the Green line to eliminate transfers in downtown San Diego; replacing overhead contact wire, upgrading the 90-lb rail to 115-lb rail; installing fiber optics system-wide; upgrading the signal system and power substations; and rebuilding several grade crossings. Transit stations will also be rehabilitated to feature bike lockers, waiting areas and next-train arrival systems.

Key concepts: Downtown, Upgrade, Train, Launched, Light rail, Installation, Light rail transit, Telecommunications

Related papers

Back to paper searchBrowse research topicsOriginal source
San Diego’s Light-rail Refresher — Research Paper | ScholarLens