LIFE CYCLE COST ANALYSIS OF CFRP PRESTRESSED CONCRETE BRIDGES
Nabil F. Grace, Elin Jensen, Christopher D. Eamon, Xiuwei Shi, Vasant Matsagar
Abstract
Nabil F. Grace, Elin Jensen, Christopher D. Eamon, Xiuwei Shi, Vasant Matsagar
Abstract
This paper presents a life cycle cost analysis of carbon fiber reinforced polymer (CFRP) reinforced concrete highway bridges. This study shows that despite the higher initial construction cost of CFRP reinforced bridges, they can be cost effective when compared to traditional steel reinforced bridges. The analysis considers the cost items of initial construction, maintenance, repair, rehabilitation and demolition activities and the associated user costs as determined by traffic volume, speed, operation and crashes. The analysis is performed for a 100-year service life. The cost information has been obtained from the literature, FHWA, and Michigan DOT. The most cost efficient alternative for side-by-side box beam bridges was a medium span CFRP bridge located in a high traffic area. Depending on traffic volume and bridge geometry, a probabilistic analysis revealed that there is greater than a 95% probability that the CFRP reinforced bridge will become the least expensive option between 20 and 40 years of service. The break-even year for the CFRP reinforced bridge is typically at the time of the first major repair activity, a shallow deck overlay, on the steel reinforced bridge.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper presents a life cycle cost analysis of carbon fiber reinforced polymer (CFRP) reinforced concrete highway bridges. This study shows that despite the higher initial construction cost of CFRP reinforced bridges, they can be cost effective when compared to traditional steel reinforced bridges. The analysis considers the cost items of initial construction, maintenance, repair, rehabilitation and demolition activities and the associated user costs as determined by traffic volume, speed, operation and crashes. The analysis is performed for a 100-year service life. The cost information has been obtained from the literature, FHWA, and Michigan DOT. The most cost efficient alternative for side-by-side box beam bridges was a medium span CFRP bridge located in a high traffic area. Depending on traffic volume and bridge geometry, a probabilistic analysis revealed that there is greater than a 95% probability that the CFRP reinforced bridge will become the least expensive option between 20 and 40 years of service. The break-even year for the CFRP reinforced bridge is typically at the time of the first major repair activity, a shallow deck overlay, on the steel reinforced bridge.
Key concepts: Bridge (graph theory), Life-cycle cost analysis, Demolition, Overlay, Service life, Structural engineering, Cost analysis, Bridge deck