Bechtel Inc. has completed an interesting twin gas line project in Algeria
D. Dietsch
Abstract
D. Dietsch
Abstract
Bechtel Inc. has completed an interesting twin gas line project in Algeria for Sonatrach. The project involved 90 km (56 mi) of dual 36 in. dia gas line in Hassi R'Mel. The system connects four gas processing plants with two natural gas reinjection stations in the Hassi R'Mel area. Since the gas produced in this field has a relatively high liquid hydrocarbon content, Sonatrach has developed a partial recycling program that will treat the raw gas in the processing plants, where the liquid is extracted and subsequently transported by pipeline to Arzew. The dry, process gas leaving the processing plants is then either shipped to one of the reinjection compressor stations for pressure maintenance of the gas reservoir, or to the Hassi R'Mel center for transport by pipeline to either Skikda or Arzew, or to Italy via the new 48 in. dia pipeline now under construction. The lines are bidirectional. The construction, ditching, pipe coating, pipelaying, welding, and inspection work done and the heavy equipment used are described and the key project personnel are named.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Bechtel Inc. has completed an interesting twin gas line project in Algeria for Sonatrach. The project involved 90 km (56 mi) of dual 36 in. dia gas line in Hassi R'Mel. The system connects four gas processing plants with two natural gas reinjection stations in the Hassi R'Mel area. Since the gas produced in this field has a relatively high liquid hydrocarbon content, Sonatrach has developed a partial recycling program that will treat the raw gas in the processing plants, where the liquid is extracted and subsequently transported by pipeline to Arzew. The dry, process gas leaving the processing plants is then either shipped to one of the reinjection compressor stations for pressure maintenance of the gas reservoir, or to the Hassi R'Mel center for transport by pipeline to either Skikda or Arzew, or to Italy via the new 48 in. dia pipeline now under construction. The lines are bidirectional. The construction, ditching, pipe coating, pipelaying, welding, and inspection work done and the heavy equipment used are described and the key project personnel are named.
Key concepts: Natural gas field, Natural gas, Petroleum engineering, Compressor station, Pipeline (software), Liquefied natural gas, Gas compressor, Gas pipeline