1979Oil & gas journal/Oil and gas journalRequires access

LARGEST BARGE-LAUNCHED JACKET IS READIED

S Matheny

Open publisher page 0 citations

Abstract

Salient features are described of the heaviest jacket structure ever to be launched from a barge, which is now being fabricated at Ardersier, Scotland. Launch weight will be 25,000 tons. To establish the platform configuration, a conceptual engineering design was carried out first. The complete design of the structure and the module support frame then followed. A special barge (semisubmersible) has been built to handle the job. The jacket will be placed in 1981 in the UK North Sea Block 211/19 for the Conoco group's Murchison field platform.

About this research paper

What this paper is about

Salient features are described of the heaviest jacket structure ever to be launched from a barge, which is now being fabricated at Ardersier, Scotland. Launch weight will be 25,000 tons. To establish the platform configuration, a conceptual engineering design was carried out first. The complete design of the structure and the module support frame then followed. A special barge (semisubmersible) has been built to handle the job. The jacket will be placed in 1981 in the UK North Sea Block 211/19 for the Conoco group's Murchison field platform.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Salient features are described of the heaviest jacket structure ever to be launched from a barge, which is now being fabricated at Ardersier, Scotland. Launch weight will be 25,000 tons. To establish the platform configuration, a conceptual engineering design was carried out first. The complete design of the structure and the module support frame then followed. A special barge (semisubmersible) has been built to handle the job. The jacket will be placed in 1981 in the UK North Sea Block 211/19 for the Conoco group's Murchison field platform.

Key concepts: BARGE, Launched, Engineering, Frame (networking), Block (permutation group theory), Salient, Marine engineering, Telecommunications

Related papers

Back to paper searchBrowse research topicsOriginal source
LARGEST BARGE-LAUNCHED JACKET IS READIED — Research Paper | ScholarLens