A technique has been developed for using two standard size cargo barges to transport and install very large steel structures. This provides an alternative approach to methods of fabricating and installing deepwater jackets in two or more pieces, or to using a super size single launch barge. Some results of a preliminary study are used to illustrate the paper and to discuss the design factors which must be considered for the barges and jacket. As a shared professional enterprise, new horizons are explored in these latest developments for the offshore industry.

About this research paper

What this paper is about

A technique has been developed for using two standard size cargo barges to transport and install very large steel structures. This provides an alternative approach to methods of fabricating and installing deepwater jackets in two or more pieces, or to using a super size single launch barge. Some results of a preliminary study are used to illustrate the paper and to discuss the design factors which must be considered for the barges and jacket. As a shared professional enterprise, new horizons are explored in these latest developments for the offshore industry.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A technique has been developed for using two standard size cargo barges to transport and install very large steel structures. This provides an alternative approach to methods of fabricating and installing deepwater jackets in two or more pieces, or to using a super size single launch barge. Some results of a preliminary study are used to illustrate the paper and to discuss the design factors which must be considered for the barges and jacket. As a shared professional enterprise, new horizons are explored in these latest developments for the offshore industry.

Key concepts: BARGE, Installation, Submarine pipeline, Marine engineering, Engineering, Construction engineering, Computer science, Mechanical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
THE GEMINI METHOD OF INSTALLING DEEPWATER PLATFORMS — Research Paper | ScholarLens