1994Forum for applied research and public policyRequires access

JAPAN'S RAIL SYSTEM: FAST TRACK TO FUTURE

Hiroumi Soejima

Open publisher page 0 citations

Abstract

Over 30 years of operation, Japan's Tokaido Shinkansen high-speed rail line has transported 3.3 billion passengers with no fatalities. The line's safe operation can be linked to the following innovations: (1) The Automatic Train Control (ATC) system; (2) The Centralized Traffic Control (CTC) system; (3) A multipurpose inspection train; (4) A clearance confirmation car operates every night after completed maintenance work, to check rail conditions; and (5) A fail-safe system automatically stops the train if either ground equipment or the train itself sustains damage.

About this research paper

What this paper is about

Over 30 years of operation, Japan's Tokaido Shinkansen high-speed rail line has transported 3.3 billion passengers with no fatalities. The line's safe operation can be linked to the following innovations: (1) The Automatic Train Control (ATC) system; (2) The Centralized Traffic Control (CTC) system; (3) A multipurpose inspection train; (4) A clearance confirmation car operates every night after completed maintenance work, to check rail conditions; and (5) A fail-safe system automatically stops the train if either ground equipment or the train itself sustains damage.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Over 30 years of operation, Japan's Tokaido Shinkansen high-speed rail line has transported 3.3 billion passengers with no fatalities. The line's safe operation can be linked to the following innovations: (1) The Automatic Train Control (ATC) system; (2) The Centralized Traffic Control (CTC) system; (3) A multipurpose inspection train; (4) A clearance confirmation car operates every night after completed maintenance work, to check rail conditions; and (5) A fail-safe system automatically stops the train if either ground equipment or the train itself sustains damage.

Key concepts: Track (disk drive), Automatic train control, Train, Engineering, Transport engineering, Track circuit, Rail network, Automotive engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
JAPAN'S RAIL SYSTEM: FAST TRACK TO FUTURE — Research Paper | ScholarLens